A European launch is several route records
“We have the European test report. Can the same box go everywhere?”
The condition-monitoring team is preparing Germany, Switzerland and Great Britain for launch. A distributor adds Northern Ireland to the comparison. The RF lab has supplied a report about a particular specimen. Sales has supplied a geographical phrase. Between those two statements sit the product scope, applicable requirements, responsible actors, documentary route and permission to operate.
Start with 09.1’s authority map and 09.2’s configuration matrix. The baseline N01 remains teaching-node-v1: generic 2.450 GHz QPSK, 20 kbit/s information, 10 ksymbol/s, RRC roll-off 0.35 and 80 ksample/s at D3. It has not become Wi-Fi or Bluetooth. Carry G02’s named Wi-Fi capability and G03’s optional cellular capability as separate, incompletely specified radios.
| Territory / activity | Source chain to investigate | What cannot be copied |
|---|---|---|
| EU-DE · Germany placing and later operation | RED + German implementation/use sources | A union-level product rule does not fill every national-use field. |
| CH · Swiss placing and operation | TIO/OFCOM + Swiss designation + actual interface | Swiss source/version, actor and national conditions. |
| GB · England, Wales, Scotland | Current radio-equipment law + chosen conformity basis | NI marking or EU citation conclusions do not become GB records automatically. |
| NI · added placing comparison | NI extent and guidance + relevant EU references | A GB-only documents source cannot close NI. |
Read the source · scope is a field, not a map colour
Compare the territorial headings in OFCOM’s market-access page and the separate GB/NI guidance. EFTA’s RED incorporation record supplies another kind of evidence: EEA incorporation. For Norway, Iceland or Liechtenstein, check the relevant act’s incorporation/adaptations and national conditions instead of assigning every EU amendment the same date. Germany is the declared EU market in this lesson. [CH-MARKET] [GB-GUIDE] [NI-GUIDE] [EEA]
Add NI as a comparison, preserving the original launch markets. Give each claim an exact territory, activity and date field; leave the actual transaction date unknown until the release plan supplies it.
Define RED scope and accountable actors
Scope begins with the assembled product and intended behavior. Identify what emits or receives, what accessories complete it, and what the customer receives. A radio module, its host gateway and the supplied adapter may each bring evidence, but the assembled product’s boundary cannot be reconstructed from a component certificate title.
RED Articles 1–2 define the scope and market roles; Articles 10–14 allocate duties. The manufacturer’s own-name product responsibility is different from an importer’s or distributor’s task. Germany’s FuAG supplies the national implementation context. [RED] [DE]
Read the source · turn nouns into reviewable facts
Read RED Article 2’s definitions of manufacturer, importer and distributor, then Article 10(3) alongside Article 12(2). Mark who performs or arranges assessment, who prepares the file and declaration, and what the importer must check. “Our European partner” supplies none of those facts. Record a proposed role separately from a verified legal entity and transaction.
| Record | Supplied teaching identity | Still needed |
|---|---|---|
| N01 baseline | A0 internal feed · P0 battery · F-EU · node-TX | German operating interface and scope; actual manufacturer and placing date |
| G02-RU connected comparison | G02-derived gateway · A0 · P2 · F-EU proposal · remote updates | Exact Wi-Fi mode, internet route, user/data/category facts and reachable concurrent states |
| G03 Swiss parent | A1 + 0.20 m coax · P2 · F-CH · node-TX | Optional cellular state is not yet part of the node-only evidence scope |
| NI added derivative | G02 parent U5, F-GB-derived comparison manifest | NI actor, firmware suitability, body role and marking-source review |
A proposed remote update is a change to the product’s possible behavior. Ask whether production, recovery and service modes can reach the same RF states as the test image. Preserve the old manifest while adding the derivative; changing an identifier without describing the change prevents a later reviewer from knowing what the report covers.
Assign the supply-chain lead to identify the legal entities and their activities. Ask firmware and RF leads to complete the mode/control boundary. None of these fields is filled by choosing a mark in a layout file.
Map essential requirements to evidence families
A requirement family describes the question the evidence must answer. An emissions plot is evidence about an observable under a setup; it does not automatically address immunity, accessible temperatures, RF exposure, privacy or receiver behavior. Use the scoped evidence discipline from 08.1: identify specimen, method, conditions, result definition, uncertainty and decision rule.
| Family / source locator | Engineering evidence to request | Configuration dependency |
|---|---|---|
| Health / safety · Article 3(1)(a), no voltage cutoff | Safety risk assessment; appropriate electrical/thermal/mechanical and exposure evidence | Supply/accessories, enclosure, accessible parts, antenna, people and installation |
| EMC · Article 3(1)(b) | Appropriate emissions and immunity evaluations | Host load, ports/cables, adapter, clocks, radio and recovery states |
| Spectrum · Article 3(2) | Transmitter and receiver evidence for the actual radio/method | Mode, band, bandwidth, channel access, antenna/feed and RF controls |
| Additional requirements · Article 3(3) | First a category/predicate review; then appropriate evidence | Internet/data/value flows, intended users and product capabilities |
| Specified charging categories · Article 3(4), Annex Ia | Category and charging-function review before selecting tests | A USB connector alone does not establish a listed category |
Read the source · the requirement is broader than a test name
Read RED Article 3, then the actual scope and Annex A of EN 300 328 V2.2.2. The standard’s correspondence concerns Article 3(2). It is not a complete product dossier. A requirement-to-evidence matrix must leave the other families visible. [RED] [ETSI]
RED’s health/safety requirement has no voltage cutoff. The low-voltage battery fact is useful context, but it does not answer accessible energy, temperature, installation or RF exposure questions. Record the applicable method and risk reasoning instead of declaring the family absent.
Split the release claim into family-specific rows. Keep applicability, evidence maturity, configuration match and source review separate: a formal report can be out of scope, and a useful pre-compliance observation may leave formal evidence missing.
Trace a conformity route to documents and marking
A conformity-assessment procedure describes how the claim is established and controlled. It is not the same object as a test report, declaration or mark. A lab may measure a specimen; a notified body has a defined assessment role; the manufacturer’s declaration connects an identified product to the applicable obligations.
Read the source · read the conditional words in Article 17
RED Article 17(2) permits Annex II, III or IV procedures for Article 3(1) and (4). For Article 3(2) and (3), paragraphs (3)–(4) distinguish applied cited harmonised standards from absent or partially applied standards: the latter case requires Annex III or IV for those requirements. Do not turn that family-specific rule into “any missing harmonised standard always requires a notified body.” [RED]
The file is a maintained argument. It explains the intended configurations, applicable requirements, risk assessment, design information, standards or other solutions and supporting results. RED Article 21 and Annex V describe that technical-documentation lane; Articles 18–20 address declaration and marking, while Article 10 includes instructions and ten-year retention of the file and declaration after placing. [RED]
| Present in the handoff | Missing relationship | Next owner |
|---|---|---|
| A report identifier with a test-image manifest | Relationship to production/recovery software and all intended configurations | Firmware + RF review |
| An exact candidate standard edition | Covered requirement, citation/restriction and selected assessment procedure | Conformity specialist |
| A proposed label and quick-start guide | Actual entity, product identity, declaration scope, required instructions and restrictions | Manufacturer documentation owner |
Go deeperA notified body and a laboratory are not interchangeable
Ask what task was performed, under which scheme and scope, by which entity, for which configuration. A test report from a competent laboratory does not by its existence demonstrate a completed notified-body procedure. Body selection and recognition need an actual current scope review; this module names the question and generates no body approval or certificate.
Record the candidate procedure per requirement, the rationale and the open body question. Link the file, declaration, instructions and label to one controlled configuration. Keep document preparation separate from a claim that the assessment is complete.
A standards PDF is not its official citation
Think about itThe newest standards PDF is on the issuer’s website. Does it already support the same legal claim as the older cited edition?
No. Existence, technical scope, official reference, covered requirement, date window and restrictions are separate facts. A newer edition may be useful technical evidence while its citation support is unknown. The older edition may still have applicable support. Read each record before choosing a route.
Reuse 07.1’s version-chain discipline. Pin the exact text you read, the official entry you rely on and the report’s method/version. A standards organisation publishes technical text; a citation or designation supplies a different documentary relationship. RED Article 16 limits the presumption to covered requirements or parts. [RED]
| Record / locator | Verified fact | Limit of this fact |
|---|---|---|
| ETSI PDF · clause 1 and Annex A [ETSI] | EN 300 328 V2.2.2, July 2019; 2.4 GHz wideband-data scope and Article 3(2) correspondence | Does not identify the teaching node as an in-scope radio. |
| EU Decision 2022/2191 · Annex I row 16 [EU-HS] | The same exact edition appears in the 2025-12-11 consolidation | Read later amendments; a consolidation date is not the standard’s publication date. |
| GB notice 0130/26 · Annex I part 1 row 16 [GB-NOTICE] | Separate GB designation of EN 300 328 V2.2.2 | Same edition does not merge legal territories, actors or product conclusions. |
Read the source · a live version gap in the citation chain
The Commission index links Decision 2026/2003, published 7 September 2026, after the linked consolidation’s date. Its complete annex changes named rows and adds 184–191; row 16 is unchanged. Some new entries carry restrictions, and specified withdrawals take effect on 7 March 2028. Read the amending act alongside the older consolidation. [EU-LIST] [EU-NEW]
The G02-RU comparison therefore has a candidate standard chain for a suitably specified 2.4 GHz wideband-data radio. It still needs the actual radio mode, scope review, complete requirement mapping and scoped reports. The G03 cellular option cannot inherit that candidate simply because it is another gateway. EN 18031 references and their citation notices are visible in the EU list, but their full technical text was not read here; clause-level security coverage remains open. [EU-HS]
Fictional timeline. TEACH-STD-A 1.0 has support from 2026-01-01 inclusive to 2026-11-01 exclusive. Edition 2.0 was published 2026-08-01; its recorded support begins 2026-10-01 inclusive with no stated end. These dates are exercise inputs.
| Activity date | Edition 1.0 | Edition 2.0 |
|---|---|---|
| 2026-09-08 | inside | pending |
| 2026-10-01 | inside | inside |
| 2026-10-31 | inside | inside |
| 2026-11-01 | ended | inside |
Edition 2.0 excludes feature Z unless a separate, scoped evidence dependency resolves that gap. A known excluded feature conflicts; unknown feature facts need inspection. A resolution checkbox without evidence cannot close the row.
| Evaluation date | Review due 2026-12-07 | Meaning |
|---|---|---|
| 2026-12-07 | current | Due date is inclusive. |
| 2026-12-08 | overdue | Recheck the source; no legal expiry or report invalidity inferred. |
| 2026-09-08; activity 2026-10-01 | current | An announced future support start is allowed. A future access/review attestation is invalid. |
All nine synthetic P AND Q cases
P means connectivity and Q means a required category fact in this fictional rule. It is a teaching predicate, not a transcription of RED, Swiss or UK law. A reviewed false condition excludes only this conditional row.
| P | Q | Conditional row |
|---|---|---|
| yes | yes | required |
| yes | no | not-applicable |
| yes | unknown | unknown |
| no | yes | not-applicable |
| no | no | not-applicable |
| no | unknown | not-applicable |
| unknown | yes | unknown |
| unknown | no | not-applicable |
| unknown | unknown | unknown |
Store exact edition and citation as separate records. When a reference changes, identify the affected requirement, feature, date and report relationship before scheduling retest. An ended citation window is not an automatic verdict that every earlier report is invalid.
Additional requirements start with product facts
Now name the connected variant: G02-RU, the condition-monitoring gateway with proposed remote updates. Internet communication is a declared capability to investigate. The data it processes, user population, intended category, money/value functions and exceptional regimes are not established. G03’s optional cellular path adds another connectivity and concurrency question; it does not remove those unknowns.
Think about itInternet connectivity is known. Can all additional requirements be marked applicable—or all privacy and fraud rows be closed?
No. Each activated requirement has its own predicate and exceptions. Establish what the product does and which category it occupies. Unknown category or data facts remain unknown. A documented false condition can exclude that particular row only; it does not exempt the rest of the product.
Read the source · three questions that need different facts
In 2022/30, Article 1(1) addresses equipment communicating over the internet, directly or through other equipment. Article 1(2) combines data-processing conditions with listed categories. Article 1(3) adds money/value-transfer functionality; Article 2 provides exceptions. Read the relevant paragraph before answering an applicability row. [EU-ADD]
| Product fact | Needed evidence | Possible engineering consequence |
|---|---|---|
| Internet path and network behavior | Architecture, interfaces, service/recovery behavior | Firmware controls, threat assessment and test scope |
| Personal/traffic/location data; intended category/users | Data-flow inventory and product-use specification | Privacy/security specialist review and revised evidence plan |
| Payment, monetary value or virtual currency transfer | Actual feature design and enabled configurations | Separate fraud-related applicability/evidence question |
| Remote update and optional concurrent radio | Production/test/recovery mappings and reachable-state evidence | New configuration version and changed RF/security evaluation scope |
The dates also need separate rows. Amended 2022/30 applies from 1 August 2025. Regulation 2026/339 is an enacted repeal effective 11 December 2027, not a pending proposal. The CRA has its own scope and staggered dates: main application on 11 December 2027, Article 14 reporting on 11 September 2026, and Chapter IV on 11 June 2026. At the source check on 9 September 2026, the reporting date is still upcoming. A security specialist must review the applicable product and transition scope. [EU-ADD] [EU-REPEAL] [CRA]
A future effective date is an already-known event to record. It is not a present exemption. Preserve the actual placing date and source history, and do not transfer an EU repeal to the Swiss or NI record without checking its own legal chain.
Ask product/security owners for the missing data and category facts before selecting a security evidence plan. Add source-change and product-update triggers to the record; keep other applicable privacy, security and product-law referrals separate from the RED determination.
Switzerland needs its own record
Think about itThe antenna and carrier frequency are unchanged between Germany and Switzerland. Does the same report settle Swiss operation?
No. The specimen identity may make the report useful, but Swiss market requirements and actual national operating conditions still need review. Frequency alone does not identify the interface, channel-access behavior, antenna condition or installation. Product conformity and lawful operation are separate questions.
Read the Swiss chain on its own terms. TIO/OIT Article 7 establishes the requirement families; Articles 12–13 address assessment; Articles 14–19 cover the technical file, declaration, retention, marking and information. The structure is familiar, but its authority and version belong in the Swiss row. The current French text was read and is paraphrased here. [CH-TIO]
Read the source · a designation and an interface do different jobs
OFCOM’s notice FF 2025 3694, dated 30 December 2025, designates the referenced EU publications through 2025/2499. Sections 4.2 and 5 distinguish its informative list and requirement correspondence. It does not itself establish Swiss designation of the later EU 2026/2003 changes. RIR1010-01 separately names wideband-data interface conditions, including antenna, access and use scope. Its unversioned standard references are not an exact-edition designation record. [CH-STANDARDS] [CH-RIR]
For inherited U7, G03 remains in node-only mode with A1, P2 and F-CH. Selecting RIR1010-01 is still a candidate question: the generic QPSK description does not establish the necessary mode classification. Adding cellular or changing its reachable states creates another question. Keep antenna/feed, power/statistic, channel access, installation and any licensing/exemption basis in the spectrum review.
| Review lane | Actual source | Unresolved product task |
|---|---|---|
| Assessment and documentation [CH-TIO] | TIO Articles 12–19 | Select procedure and confirm language, declaration/configuration, marking and operator information. |
| Declaration detail [CH-DOC] | OFCOM declaration guidance | Check accessories/software scope; no signed declaration exists in the teaching record. |
| Additional requirements [CH-OOIT] | OOIT Article 1, Annex 1 rows 7–9 and Article 10b | Review categories and Swiss transition against connected variant facts. |
| National operation [CH-RIR] | Applicable radio interface, once selected | Demonstrate actual mode and conditions; preserve this gap independently of the dossier. |
The Swiss additional-requirement transition is visible in OOIT Article 10b: the specified affected equipment could be placed without meeting those requirements through 31 July 2025. The current Swiss record therefore needs its own category and date review; the future EU repeal is not a Swiss amendment. [CH-OOIT]
Assign the Swiss spectrum specialist to select and check the interface, and the Swiss compliance/security lead to review the dossier and connected-product predicates. Leave national-use scope unknown until the actual facts are supplied.
Great Britain needs a dated marking decision
Great Britain means England, Wales and Scotland for this record. Begin with the current radio-equipment provisions and the proposed activity. “UKCA is required after 2024” is an outdated shortcut for this product-law orientation: the government guidance describes continuing CE recognition alongside the UKCA option, with conditions. The enacted 2024 amendment and current law provide the documentary basis. [GB-GUIDE] [GB-AMEND]
Read the source · recognition is a conditional route
Read Regulation 36A in its GB extent, including the documentation conditions and paragraphs (6)–(7) on exact corresponding standards. Then inspect Regulation 41’s requirement-specific procedures. Record which basis is proposed and what supports each condition. A photograph of a CE mark cannot establish the full chain. [GB-LAW] Regulation 41
| Field | Supplied source fact | Case-specific review still required |
|---|---|---|
| Conformity/marking basis | Current guidance describes CE recognition and UKCA options | Choose and justify the applicable basis, requirements and body conditions. |
| Designated edition | Notice 0130/26 of 21 January 2026 includes EN 300 328 V2.2.2 | Scope and coverage for the actual G02 radio and claim. |
| Source date | Index updated 1 May 2026; notice dated 21 January | Do not use the index update as designation commencement. |
| Actor/task | Manufacturer and importer duties are separately described | Actual entity, establishment, transaction, documents and assigned responsibility. |
The GB designated-standard notice supplies a GB entry. Its edition may match the EU reference, but retain both source IDs and both scope reviews. For the illustrative G02, the inherited U5 EMC report does not become spectrum evidence merely because the same host appears in both questions. A national operating-rule review remains another lane. [GB-NOTICE] [GB-INDEX]
Resolve the GB actor/task before treating the packet as documented. Store the chosen conformity basis, exact source/version and activity date, then route outstanding documentation, body and spectrum questions to the appropriate owners.
Northern Ireland is a separate territory case
Northern Ireland is an added comparison market here. The NI derivative keeps U5’s parent manifest and explicitly marks the F-GB-derived image as unreviewed for NI. It does not silently replace the GB launch or convert the parent’s report into NI evidence.
Read the source · the body’s task changes the marking question
NI radio-equipment guidance distinguishes CE from CE+UKNI when mandatory third-party assessment uses a UK notified body. Self-declaration does not use UKNI; an EU notified-body route has different marking implications. CE+UKNI does not provide EEA access. A report issued by an ordinary testing laboratory does not, by itself, establish which mandatory assessment route was used. [NI-GUIDE]
| Question | Why the GB answer is insufficient | Owner |
|---|---|---|
| Which entity performs which market role? | The actual NI transaction and establishment matter. | Supply-chain compliance lead |
| Is body involvement mandatory, and which body/task? | A lab name is not a notified-body mandate or scope. | NI conformity specialist |
| Which marking/document source supports this case? | A GB-only source has the wrong territory. | NI documentation owner |
| Are these qualifying NI goods for GB access? | That status needs its own facts and conditions; it is not a label. | NI/GB market-access specialist |
Keep the legal extent visible too. The revised NI additional-requirement provision in Regulation 6A includes its own amendment history. Read the NI extent instead of copying the GB extent’s text. Product categories, dates, data functions and exceptions still require review. [NI-LAW]
There is no combined UK packet in this exercise. Repairing GB-A changes GB. NI-D still points to a GB-only documents source and remains a challenge. A shared report and geographical proximity do not supply the missing NI relationship.
Create the NI-specific source and responsibility record. Ask the specialist to establish actor/body and qualifying-goods facts, review firmware suitability, and determine the applicable documentary/marking conditions before release planning uses this comparison.
Compare evidence without transferring conclusions
The comparator below freezes a second, explicitly fictional dataset at 2026-09-08. It does not execute the laws above. Four territory-labelled packets each contain eight documentary gates: identity/activity, requirement scope, citation support, evidence/configuration, actor, documents/marking source, national spectrum and additional-requirement review.
The original gaps are deliberately different: EU-DE has an unknown citation for a newer edition; CH lacks its national-use review; GB contains an explicit actor conflict; NI cites a GB-only marking source. Expect two inspect, two challenge and zero complete. A complete packet means only “review packet trace complete.” Validation precedes evaluation; explicit contradictions outrank unknowns, and every reason is retained.
European Route Comparator
Repair a source or evidence relationship, then inspect exactly which territory changes. The eight gates are review dimensions in a fictional model.
The complete original fixture and its results are below. JavaScript enables draft editing; all lesson records and native answer disclosures remain usable without it.
Committed review packet: Original four gaps
european-route-comparator/2.0 · p09-m03-route-rules-v1 · p09-m03-four-route-fixture-v1
Evaluation 2026-09-08 · placing-on-market activity 2026-09-08. Fictional records; dates have no real attestation.
2 inspect · 2 challenge · 0 review packet trace complete
“Challenge” identifies an explicit contradiction; “inspect” identifies missing or overdue support. “Review packet trace complete” means only that every required exercise gate is recorded consistently. Every failed or unknown reason remains below.
| Territory | Original four gaps | Committed packet |
|---|---|---|
| EU-DE | inspect | inspect |
| CH | inspect | inspect |
| GB | challenge | challenge |
| NI | challenge | challenge |
EU-DE inspect
TEACH-MAN-G02-v1 · placing-on-market. Conditional X: required; citation entry: unknown; temporal window: pending; source review: current.
| Gate | Applicability / state | Source or evidence dependencies |
|---|---|---|
| J · Identity and activity | required pass-in-metadata | TEACH-EU-DE-BASIS |
| R · Requirement scope | required pass-in-metadata | TEACH-EU-DE-BASIS |
| S · Standard and citation support | required unknown | TEACH-EU-DE-CITATION |
| E · Evidence and configuration | required pass-in-metadata | TEACH-SHARED-REPORT |
| A · Actor and task | required pass-in-metadata | TEACH-EU-DE-BASIS |
| D · Documents and marking source | required pass-in-metadata | TEACH-EU-DE-DOCUMENTS |
| F · National spectrum question | required pass-in-metadata | TEACH-EU-DE-SPECTRUM |
| X · Additional-requirement review | required pass-in-metadata | TEACH-EU-DE-BASIS |
EU-DE-J: Recorded rationale
Recorded identity and activity facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
EU-DE-R: Recorded rationale
Recorded requirement scope facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
EU-DE-S: 1 unresolved reason
Recorded standard and citation support facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
- citation-unknown · unknown
Publication of TEACH-STD-A does not establish a relevant citation entry.
EU-DE-S → TEACH-PACKET-EU-DE
EU-DE-E: Recorded rationale
Recorded evidence and configuration facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
EU-DE-A: Recorded rationale
Recorded actor and task facts satisfy only the exercise predicate.
Owner: Supply-chain compliance lead. Review: 2026-09-08. Applicability: required.
EU-DE-D: Recorded rationale
Recorded documents and marking source facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
EU-DE-F: Recorded rationale
Recorded national spectrum question facts satisfy only the exercise predicate.
Owner: National spectrum specialist. Review: 2026-09-08. Applicability: required.
EU-DE-X: Recorded rationale
Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
Owner: Product security and jurisdiction specialist. Review: 2026-09-08. Applicability: required.
EU-DE: questions for the next specialist review
- EU-DE-S → Jurisdiction compliance lead: Publication of TEACH-STD-A does not establish a relevant citation entry. What scoped source or evidence resolves this?
EU-DE: full dated input and decision snapshot
- id
- EU-DE
- territory
- EU-DE
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- identity
- yes
- standard · id
- TEACH-STD-A
- standard · edition
- 2.0
- standard · entry
- unknown
- standard · territory
- EU-DE
- standard · requirement
- TEACH-SPECTRUM
- standard · scope
- yes
- standard · feature Z
- no
- standard · restriction Resolved
- no
- connectivity
- yes
- category
- yes
- predicate Reviewed
- true
- gates 1 · id
- EU-DE-J
- gates 1 · code
- J
- gates 1 · fact
- yes
- gates 1 · applicability
- required
- gates 1 · na Reviewed
- false
- gates 1 · rationale
- Recorded identity and activity facts satisfy only the exercise predicate.
- gates 1 · owner
- Jurisdiction compliance lead
- gates 1 · reviewed
- 2026-09-08
- gates 1 · dependencies 1
- TEACH-EU-DE-BASIS
- gates 1 · state
- pass-in-metadata
- gates 1 · reasons
- None recorded
- gates 2 · id
- EU-DE-R
- gates 2 · code
- R
- gates 2 · fact
- yes
- gates 2 · applicability
- required
- gates 2 · na Reviewed
- false
- gates 2 · rationale
- Recorded requirement scope facts satisfy only the exercise predicate.
- gates 2 · owner
- Jurisdiction compliance lead
- gates 2 · reviewed
- 2026-09-08
- gates 2 · dependencies 1
- TEACH-EU-DE-BASIS
- gates 2 · state
- pass-in-metadata
- gates 2 · reasons
- None recorded
- gates 3 · id
- EU-DE-S
- gates 3 · code
- S
- gates 3 · fact
- yes
- gates 3 · applicability
- required
- gates 3 · na Reviewed
- false
- gates 3 · rationale
- Recorded standard and citation support facts satisfy only the exercise predicate.
- gates 3 · owner
- Jurisdiction compliance lead
- gates 3 · reviewed
- 2026-09-08
- gates 3 · dependencies 1
- TEACH-EU-DE-CITATION
- gates 3 · state
- unknown
- gates 3 · reasons 1 · state
- unknown
- gates 3 · reasons 1 · code
- citation-unknown
- gates 3 · reasons 1 · detail
- Publication of TEACH-STD-A does not establish a relevant citation entry.
- gates 3 · reasons 1 · path 1
- EU-DE-S
- gates 3 · reasons 1 · path 2
- TEACH-PACKET-EU-DE
- gates 4 · id
- EU-DE-E
- gates 4 · code
- E
- gates 4 · fact
- yes
- gates 4 · applicability
- required
- gates 4 · na Reviewed
- false
- gates 4 · rationale
- Recorded evidence and configuration facts satisfy only the exercise predicate.
- gates 4 · owner
- Jurisdiction compliance lead
- gates 4 · reviewed
- 2026-09-08
- gates 4 · dependencies 1
- TEACH-SHARED-REPORT
- gates 4 · state
- pass-in-metadata
- gates 4 · reasons
- None recorded
- gates 5 · id
- EU-DE-A
- gates 5 · code
- A
- gates 5 · fact
- yes
- gates 5 · applicability
- required
- gates 5 · na Reviewed
- false
- gates 5 · rationale
- Recorded actor and task facts satisfy only the exercise predicate.
- gates 5 · owner
- Supply-chain compliance lead
- gates 5 · reviewed
- 2026-09-08
- gates 5 · dependencies 1
- TEACH-EU-DE-BASIS
- gates 5 · state
- pass-in-metadata
- gates 5 · reasons
- None recorded
- gates 6 · id
- EU-DE-D
- gates 6 · code
- D
- gates 6 · fact
- yes
- gates 6 · applicability
- required
- gates 6 · na Reviewed
- false
- gates 6 · rationale
- Recorded documents and marking source facts satisfy only the exercise predicate.
- gates 6 · owner
- Jurisdiction compliance lead
- gates 6 · reviewed
- 2026-09-08
- gates 6 · dependencies 1
- TEACH-EU-DE-DOCUMENTS
- gates 6 · state
- pass-in-metadata
- gates 6 · reasons
- None recorded
- gates 7 · id
- EU-DE-F
- gates 7 · code
- F
- gates 7 · fact
- yes
- gates 7 · applicability
- required
- gates 7 · na Reviewed
- false
- gates 7 · rationale
- Recorded national spectrum question facts satisfy only the exercise predicate.
- gates 7 · owner
- National spectrum specialist
- gates 7 · reviewed
- 2026-09-08
- gates 7 · dependencies 1
- TEACH-EU-DE-SPECTRUM
- gates 7 · state
- pass-in-metadata
- gates 7 · reasons
- None recorded
- gates 8 · id
- EU-DE-X
- gates 8 · code
- X
- gates 8 · fact
- yes
- gates 8 · applicability
- required
- gates 8 · na Reviewed
- false
- gates 8 · rationale
- Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
- gates 8 · owner
- Product security and jurisdiction specialist
- gates 8 · reviewed
- 2026-09-08
- gates 8 · dependencies 1
- TEACH-EU-DE-BASIS
- gates 8 · state
- pass-in-metadata
- gates 8 · reasons
- None recorded
- evaluation Date
- 2026-09-08
- activity Date
- 2026-09-08
- standard Publication
- 2026-08-01
- citation Window
- [2026-10-01, no stated end)
- decision
- inspect
- temporal
- pending
- source Review
- current
- conditional Applicability
- required
- questions 1
- EU-DE-S → Jurisdiction compliance lead: Publication of TEACH-STD-A does not establish a relevant citation entry. What scoped source or evidence resolves this?
CH inspect
TEACH-MAN-G02-v1 · placing-on-market. Conditional X: required; citation entry: recorded; temporal window: inside; source review: current.
| Gate | Applicability / state | Source or evidence dependencies |
|---|---|---|
| J · Identity and activity | required pass-in-metadata | TEACH-CH-BASIS |
| R · Requirement scope | required pass-in-metadata | TEACH-CH-BASIS |
| S · Standard and citation support | required pass-in-metadata | TEACH-CH-CITATION |
| E · Evidence and configuration | required pass-in-metadata | TEACH-SHARED-REPORT |
| A · Actor and task | required pass-in-metadata | TEACH-CH-BASIS |
| D · Documents and marking source | required pass-in-metadata | TEACH-CH-DOCUMENTS |
| F · National spectrum question | required unknown | TEACH-CH-SPECTRUM |
| X · Additional-requirement review | required pass-in-metadata | TEACH-CH-BASIS |
CH-J: Recorded rationale
Recorded identity and activity facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
CH-R: Recorded rationale
Recorded requirement scope facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
CH-S: Recorded rationale
Recorded standard and citation support facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
CH-E: Recorded rationale
Recorded evidence and configuration facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
CH-A: Recorded rationale
Recorded actor and task facts satisfy only the exercise predicate.
Owner: Supply-chain compliance lead. Review: 2026-09-08. Applicability: required.
CH-D: Recorded rationale
Recorded documents and marking source facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
CH-F: 1 unresolved reason
National use conditions for the selected mode have not been checked.
Owner: National spectrum specialist. Review: 2026-09-08. Applicability: required.
- fact-unknown · unknown
National use conditions for the selected mode have not been checked.
CH-F → TEACH-PACKET-CH
CH-X: Recorded rationale
Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
Owner: Product security and jurisdiction specialist. Review: 2026-09-08. Applicability: required.
CH: questions for the next specialist review
- CH-F → National spectrum specialist: National use conditions for the selected mode have not been checked. What scoped source or evidence resolves this?
CH: full dated input and decision snapshot
- id
- CH
- territory
- CH
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- identity
- yes
- standard · id
- TEACH-STD-A
- standard · edition
- 1.0
- standard · entry
- recorded
- standard · territory
- CH
- standard · requirement
- TEACH-SPECTRUM
- standard · scope
- yes
- standard · feature Z
- no
- standard · restriction Resolved
- no
- connectivity
- yes
- category
- yes
- predicate Reviewed
- true
- gates 1 · id
- CH-J
- gates 1 · code
- J
- gates 1 · fact
- yes
- gates 1 · applicability
- required
- gates 1 · na Reviewed
- false
- gates 1 · rationale
- Recorded identity and activity facts satisfy only the exercise predicate.
- gates 1 · owner
- Jurisdiction compliance lead
- gates 1 · reviewed
- 2026-09-08
- gates 1 · dependencies 1
- TEACH-CH-BASIS
- gates 1 · state
- pass-in-metadata
- gates 1 · reasons
- None recorded
- gates 2 · id
- CH-R
- gates 2 · code
- R
- gates 2 · fact
- yes
- gates 2 · applicability
- required
- gates 2 · na Reviewed
- false
- gates 2 · rationale
- Recorded requirement scope facts satisfy only the exercise predicate.
- gates 2 · owner
- Jurisdiction compliance lead
- gates 2 · reviewed
- 2026-09-08
- gates 2 · dependencies 1
- TEACH-CH-BASIS
- gates 2 · state
- pass-in-metadata
- gates 2 · reasons
- None recorded
- gates 3 · id
- CH-S
- gates 3 · code
- S
- gates 3 · fact
- yes
- gates 3 · applicability
- required
- gates 3 · na Reviewed
- false
- gates 3 · rationale
- Recorded standard and citation support facts satisfy only the exercise predicate.
- gates 3 · owner
- Jurisdiction compliance lead
- gates 3 · reviewed
- 2026-09-08
- gates 3 · dependencies 1
- TEACH-CH-CITATION
- gates 3 · state
- pass-in-metadata
- gates 3 · reasons
- None recorded
- gates 4 · id
- CH-E
- gates 4 · code
- E
- gates 4 · fact
- yes
- gates 4 · applicability
- required
- gates 4 · na Reviewed
- false
- gates 4 · rationale
- Recorded evidence and configuration facts satisfy only the exercise predicate.
- gates 4 · owner
- Jurisdiction compliance lead
- gates 4 · reviewed
- 2026-09-08
- gates 4 · dependencies 1
- TEACH-SHARED-REPORT
- gates 4 · state
- pass-in-metadata
- gates 4 · reasons
- None recorded
- gates 5 · id
- CH-A
- gates 5 · code
- A
- gates 5 · fact
- yes
- gates 5 · applicability
- required
- gates 5 · na Reviewed
- false
- gates 5 · rationale
- Recorded actor and task facts satisfy only the exercise predicate.
- gates 5 · owner
- Supply-chain compliance lead
- gates 5 · reviewed
- 2026-09-08
- gates 5 · dependencies 1
- TEACH-CH-BASIS
- gates 5 · state
- pass-in-metadata
- gates 5 · reasons
- None recorded
- gates 6 · id
- CH-D
- gates 6 · code
- D
- gates 6 · fact
- yes
- gates 6 · applicability
- required
- gates 6 · na Reviewed
- false
- gates 6 · rationale
- Recorded documents and marking source facts satisfy only the exercise predicate.
- gates 6 · owner
- Jurisdiction compliance lead
- gates 6 · reviewed
- 2026-09-08
- gates 6 · dependencies 1
- TEACH-CH-DOCUMENTS
- gates 6 · state
- pass-in-metadata
- gates 6 · reasons
- None recorded
- gates 7 · id
- CH-F
- gates 7 · code
- F
- gates 7 · fact
- unknown
- gates 7 · applicability
- required
- gates 7 · na Reviewed
- false
- gates 7 · rationale
- National use conditions for the selected mode have not been checked.
- gates 7 · owner
- National spectrum specialist
- gates 7 · reviewed
- 2026-09-08
- gates 7 · dependencies 1
- TEACH-CH-SPECTRUM
- gates 7 · state
- unknown
- gates 7 · reasons 1 · state
- unknown
- gates 7 · reasons 1 · code
- fact-unknown
- gates 7 · reasons 1 · detail
- National use conditions for the selected mode have not been checked.
- gates 7 · reasons 1 · path 1
- CH-F
- gates 7 · reasons 1 · path 2
- TEACH-PACKET-CH
- gates 8 · id
- CH-X
- gates 8 · code
- X
- gates 8 · fact
- yes
- gates 8 · applicability
- required
- gates 8 · na Reviewed
- false
- gates 8 · rationale
- Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
- gates 8 · owner
- Product security and jurisdiction specialist
- gates 8 · reviewed
- 2026-09-08
- gates 8 · dependencies 1
- TEACH-CH-BASIS
- gates 8 · state
- pass-in-metadata
- gates 8 · reasons
- None recorded
- evaluation Date
- 2026-09-08
- activity Date
- 2026-09-08
- standard Publication
- 2026-01-01
- citation Window
- [2026-01-01, 2026-11-01)
- decision
- inspect
- temporal
- inside
- source Review
- current
- conditional Applicability
- required
- questions 1
- CH-F → National spectrum specialist: National use conditions for the selected mode have not been checked. What scoped source or evidence resolves this?
GB challenge
TEACH-MAN-G02-v1 · placing-on-market. Conditional X: required; citation entry: recorded; temporal window: inside; source review: current.
| Gate | Applicability / state | Source or evidence dependencies |
|---|---|---|
| J · Identity and activity | required pass-in-metadata | TEACH-GB-BASIS |
| R · Requirement scope | required pass-in-metadata | TEACH-GB-BASIS |
| S · Standard and citation support | required pass-in-metadata | TEACH-GB-CITATION |
| E · Evidence and configuration | required pass-in-metadata | TEACH-SHARED-REPORT |
| A · Actor and task | required conflict | TEACH-GB-BASIS |
| D · Documents and marking source | required pass-in-metadata | TEACH-GB-DOCUMENTS |
| F · National spectrum question | required pass-in-metadata | TEACH-GB-SPECTRUM |
| X · Additional-requirement review | required pass-in-metadata | TEACH-GB-BASIS |
GB-J: Recorded rationale
Recorded identity and activity facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
GB-R: Recorded rationale
Recorded requirement scope facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
GB-S: Recorded rationale
Recorded standard and citation support facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
GB-E: Recorded rationale
Recorded evidence and configuration facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
GB-A: 1 unresolved reason
The assigned actor explicitly contradicts the declared GB jurisdiction/task.
Owner: Supply-chain compliance lead. Review: 2026-09-08. Applicability: required.
- fact-conflict · conflict
The assigned actor explicitly contradicts the declared GB jurisdiction/task.
GB-A → TEACH-PACKET-GB
GB-D: Recorded rationale
Recorded documents and marking source facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
GB-F: Recorded rationale
Recorded national spectrum question facts satisfy only the exercise predicate.
Owner: National spectrum specialist. Review: 2026-09-08. Applicability: required.
GB-X: Recorded rationale
Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
Owner: Product security and jurisdiction specialist. Review: 2026-09-08. Applicability: required.
GB: questions for the next specialist review
- GB-A → Supply-chain compliance lead: The assigned actor explicitly contradicts the declared GB jurisdiction/task. What scoped source or evidence resolves this?
GB: full dated input and decision snapshot
- id
- GB
- territory
- GB
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- identity
- yes
- standard · id
- TEACH-STD-A
- standard · edition
- 1.0
- standard · entry
- recorded
- standard · territory
- GB
- standard · requirement
- TEACH-SPECTRUM
- standard · scope
- yes
- standard · feature Z
- no
- standard · restriction Resolved
- no
- connectivity
- yes
- category
- yes
- predicate Reviewed
- true
- gates 1 · id
- GB-J
- gates 1 · code
- J
- gates 1 · fact
- yes
- gates 1 · applicability
- required
- gates 1 · na Reviewed
- false
- gates 1 · rationale
- Recorded identity and activity facts satisfy only the exercise predicate.
- gates 1 · owner
- Jurisdiction compliance lead
- gates 1 · reviewed
- 2026-09-08
- gates 1 · dependencies 1
- TEACH-GB-BASIS
- gates 1 · state
- pass-in-metadata
- gates 1 · reasons
- None recorded
- gates 2 · id
- GB-R
- gates 2 · code
- R
- gates 2 · fact
- yes
- gates 2 · applicability
- required
- gates 2 · na Reviewed
- false
- gates 2 · rationale
- Recorded requirement scope facts satisfy only the exercise predicate.
- gates 2 · owner
- Jurisdiction compliance lead
- gates 2 · reviewed
- 2026-09-08
- gates 2 · dependencies 1
- TEACH-GB-BASIS
- gates 2 · state
- pass-in-metadata
- gates 2 · reasons
- None recorded
- gates 3 · id
- GB-S
- gates 3 · code
- S
- gates 3 · fact
- yes
- gates 3 · applicability
- required
- gates 3 · na Reviewed
- false
- gates 3 · rationale
- Recorded standard and citation support facts satisfy only the exercise predicate.
- gates 3 · owner
- Jurisdiction compliance lead
- gates 3 · reviewed
- 2026-09-08
- gates 3 · dependencies 1
- TEACH-GB-CITATION
- gates 3 · state
- pass-in-metadata
- gates 3 · reasons
- None recorded
- gates 4 · id
- GB-E
- gates 4 · code
- E
- gates 4 · fact
- yes
- gates 4 · applicability
- required
- gates 4 · na Reviewed
- false
- gates 4 · rationale
- Recorded evidence and configuration facts satisfy only the exercise predicate.
- gates 4 · owner
- Jurisdiction compliance lead
- gates 4 · reviewed
- 2026-09-08
- gates 4 · dependencies 1
- TEACH-SHARED-REPORT
- gates 4 · state
- pass-in-metadata
- gates 4 · reasons
- None recorded
- gates 5 · id
- GB-A
- gates 5 · code
- A
- gates 5 · fact
- no
- gates 5 · applicability
- required
- gates 5 · na Reviewed
- false
- gates 5 · rationale
- The assigned actor explicitly contradicts the declared GB jurisdiction/task.
- gates 5 · owner
- Supply-chain compliance lead
- gates 5 · reviewed
- 2026-09-08
- gates 5 · dependencies 1
- TEACH-GB-BASIS
- gates 5 · state
- conflict
- gates 5 · reasons 1 · state
- conflict
- gates 5 · reasons 1 · code
- fact-conflict
- gates 5 · reasons 1 · detail
- The assigned actor explicitly contradicts the declared GB jurisdiction/task.
- gates 5 · reasons 1 · path 1
- GB-A
- gates 5 · reasons 1 · path 2
- TEACH-PACKET-GB
- gates 6 · id
- GB-D
- gates 6 · code
- D
- gates 6 · fact
- yes
- gates 6 · applicability
- required
- gates 6 · na Reviewed
- false
- gates 6 · rationale
- Recorded documents and marking source facts satisfy only the exercise predicate.
- gates 6 · owner
- Jurisdiction compliance lead
- gates 6 · reviewed
- 2026-09-08
- gates 6 · dependencies 1
- TEACH-GB-DOCUMENTS
- gates 6 · state
- pass-in-metadata
- gates 6 · reasons
- None recorded
- gates 7 · id
- GB-F
- gates 7 · code
- F
- gates 7 · fact
- yes
- gates 7 · applicability
- required
- gates 7 · na Reviewed
- false
- gates 7 · rationale
- Recorded national spectrum question facts satisfy only the exercise predicate.
- gates 7 · owner
- National spectrum specialist
- gates 7 · reviewed
- 2026-09-08
- gates 7 · dependencies 1
- TEACH-GB-SPECTRUM
- gates 7 · state
- pass-in-metadata
- gates 7 · reasons
- None recorded
- gates 8 · id
- GB-X
- gates 8 · code
- X
- gates 8 · fact
- yes
- gates 8 · applicability
- required
- gates 8 · na Reviewed
- false
- gates 8 · rationale
- Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
- gates 8 · owner
- Product security and jurisdiction specialist
- gates 8 · reviewed
- 2026-09-08
- gates 8 · dependencies 1
- TEACH-GB-BASIS
- gates 8 · state
- pass-in-metadata
- gates 8 · reasons
- None recorded
- evaluation Date
- 2026-09-08
- activity Date
- 2026-09-08
- standard Publication
- 2026-01-01
- citation Window
- [2026-01-01, 2026-11-01)
- decision
- challenge
- temporal
- inside
- source Review
- current
- conditional Applicability
- required
- questions 1
- GB-A → Supply-chain compliance lead: The assigned actor explicitly contradicts the declared GB jurisdiction/task. What scoped source or evidence resolves this?
NI challenge
TEACH-MAN-G02-v1 · placing-on-market. Conditional X: required; citation entry: recorded; temporal window: inside; source review: current.
| Gate | Applicability / state | Source or evidence dependencies |
|---|---|---|
| J · Identity and activity | required pass-in-metadata | TEACH-NI-BASIS |
| R · Requirement scope | required pass-in-metadata | TEACH-NI-BASIS |
| S · Standard and citation support | required pass-in-metadata | TEACH-NI-CITATION |
| E · Evidence and configuration | required pass-in-metadata | TEACH-SHARED-REPORT |
| A · Actor and task | required pass-in-metadata | TEACH-NI-BASIS |
| D · Documents and marking source | required conflict | TEACH-GB-DOCUMENTS |
| F · National spectrum question | required pass-in-metadata | TEACH-NI-SPECTRUM |
| X · Additional-requirement review | required pass-in-metadata | TEACH-NI-BASIS |
NI-J: Recorded rationale
Recorded identity and activity facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
NI-R: Recorded rationale
Recorded requirement scope facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
NI-S: Recorded rationale
Recorded standard and citation support facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
NI-E: Recorded rationale
Recorded evidence and configuration facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
NI-A: Recorded rationale
Recorded actor and task facts satisfy only the exercise predicate.
Owner: Supply-chain compliance lead. Review: 2026-09-08. Applicability: required.
NI-D: 1 unresolved reason
Recorded documents and marking source facts satisfy only the exercise predicate.
Owner: Jurisdiction compliance lead. Review: 2026-09-08. Applicability: required.
- source-territory · conflict
TEACH-GB-DOCUMENTS is scoped to GB; it cannot close NI.
TEACH-GB-DOCUMENTS → NI-D → TEACH-PACKET-NI
NI-F: Recorded rationale
Recorded national spectrum question facts satisfy only the exercise predicate.
Owner: National spectrum specialist. Review: 2026-09-08. Applicability: required.
NI-X: Recorded rationale
Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
Owner: Product security and jurisdiction specialist. Review: 2026-09-08. Applicability: required.
NI: questions for the next specialist review
- NI-D → Jurisdiction compliance lead: TEACH-GB-DOCUMENTS is scoped to GB; it cannot close NI. What scoped source or evidence resolves this?
NI: full dated input and decision snapshot
- id
- NI
- territory
- NI
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- identity
- yes
- standard · id
- TEACH-STD-A
- standard · edition
- 1.0
- standard · entry
- recorded
- standard · territory
- NI
- standard · requirement
- TEACH-SPECTRUM
- standard · scope
- yes
- standard · feature Z
- no
- standard · restriction Resolved
- no
- connectivity
- yes
- category
- yes
- predicate Reviewed
- true
- gates 1 · id
- NI-J
- gates 1 · code
- J
- gates 1 · fact
- yes
- gates 1 · applicability
- required
- gates 1 · na Reviewed
- false
- gates 1 · rationale
- Recorded identity and activity facts satisfy only the exercise predicate.
- gates 1 · owner
- Jurisdiction compliance lead
- gates 1 · reviewed
- 2026-09-08
- gates 1 · dependencies 1
- TEACH-NI-BASIS
- gates 1 · state
- pass-in-metadata
- gates 1 · reasons
- None recorded
- gates 2 · id
- NI-R
- gates 2 · code
- R
- gates 2 · fact
- yes
- gates 2 · applicability
- required
- gates 2 · na Reviewed
- false
- gates 2 · rationale
- Recorded requirement scope facts satisfy only the exercise predicate.
- gates 2 · owner
- Jurisdiction compliance lead
- gates 2 · reviewed
- 2026-09-08
- gates 2 · dependencies 1
- TEACH-NI-BASIS
- gates 2 · state
- pass-in-metadata
- gates 2 · reasons
- None recorded
- gates 3 · id
- NI-S
- gates 3 · code
- S
- gates 3 · fact
- yes
- gates 3 · applicability
- required
- gates 3 · na Reviewed
- false
- gates 3 · rationale
- Recorded standard and citation support facts satisfy only the exercise predicate.
- gates 3 · owner
- Jurisdiction compliance lead
- gates 3 · reviewed
- 2026-09-08
- gates 3 · dependencies 1
- TEACH-NI-CITATION
- gates 3 · state
- pass-in-metadata
- gates 3 · reasons
- None recorded
- gates 4 · id
- NI-E
- gates 4 · code
- E
- gates 4 · fact
- yes
- gates 4 · applicability
- required
- gates 4 · na Reviewed
- false
- gates 4 · rationale
- Recorded evidence and configuration facts satisfy only the exercise predicate.
- gates 4 · owner
- Jurisdiction compliance lead
- gates 4 · reviewed
- 2026-09-08
- gates 4 · dependencies 1
- TEACH-SHARED-REPORT
- gates 4 · state
- pass-in-metadata
- gates 4 · reasons
- None recorded
- gates 5 · id
- NI-A
- gates 5 · code
- A
- gates 5 · fact
- yes
- gates 5 · applicability
- required
- gates 5 · na Reviewed
- false
- gates 5 · rationale
- Recorded actor and task facts satisfy only the exercise predicate.
- gates 5 · owner
- Supply-chain compliance lead
- gates 5 · reviewed
- 2026-09-08
- gates 5 · dependencies 1
- TEACH-NI-BASIS
- gates 5 · state
- pass-in-metadata
- gates 5 · reasons
- None recorded
- gates 6 · id
- NI-D
- gates 6 · code
- D
- gates 6 · fact
- yes
- gates 6 · applicability
- required
- gates 6 · na Reviewed
- false
- gates 6 · rationale
- Recorded documents and marking source facts satisfy only the exercise predicate.
- gates 6 · owner
- Jurisdiction compliance lead
- gates 6 · reviewed
- 2026-09-08
- gates 6 · dependencies 1
- TEACH-GB-DOCUMENTS
- gates 6 · state
- conflict
- gates 6 · reasons 1 · state
- conflict
- gates 6 · reasons 1 · code
- source-territory
- gates 6 · reasons 1 · detail
- TEACH-GB-DOCUMENTS is scoped to GB; it cannot close NI.
- gates 6 · reasons 1 · path 1
- TEACH-GB-DOCUMENTS
- gates 6 · reasons 1 · path 2
- NI-D
- gates 6 · reasons 1 · path 3
- TEACH-PACKET-NI
- gates 7 · id
- NI-F
- gates 7 · code
- F
- gates 7 · fact
- yes
- gates 7 · applicability
- required
- gates 7 · na Reviewed
- false
- gates 7 · rationale
- Recorded national spectrum question facts satisfy only the exercise predicate.
- gates 7 · owner
- National spectrum specialist
- gates 7 · reviewed
- 2026-09-08
- gates 7 · dependencies 1
- TEACH-NI-SPECTRUM
- gates 7 · state
- pass-in-metadata
- gates 7 · reasons
- None recorded
- gates 8 · id
- NI-X
- gates 8 · code
- X
- gates 8 · fact
- yes
- gates 8 · applicability
- required
- gates 8 · na Reviewed
- false
- gates 8 · rationale
- Synthetic predicate P AND Q; P=yes, Q=yes, predicate reviewed=true. Recorded additional-requirement review facts satisfy only the exercise predicate.
- gates 8 · owner
- Product security and jurisdiction specialist
- gates 8 · reviewed
- 2026-09-08
- gates 8 · dependencies 1
- TEACH-NI-BASIS
- gates 8 · state
- pass-in-metadata
- gates 8 · reasons
- None recorded
- evaluation Date
- 2026-09-08
- activity Date
- 2026-09-08
- standard Publication
- 2026-01-01
- citation Window
- [2026-01-01, 2026-11-01)
- decision
- challenge
- temporal
- inside
- source Review
- current
- conditional Applicability
- required
- questions 1
- NI-D → Jurisdiction compliance lead: TEACH-GB-DOCUMENTS is scoped to GB; it cannot close NI. What scoped source or evidence resolves this?
Shared and divergent source relationships
The shared report is one fictional evidence item with four declared dependencies. It does not merge the four conclusions. The GB-only documents source’s link to NI is a visible conflict until separately repaired. Unreferenced feature-Z evidence is available metadata; it supports no gate until a dependency is recorded.
| Source / role | Territory scope | Dependent gates |
|---|---|---|
| TEACH-CH-BASIS synthetic documentary source | CH | CH-J, CH-R, CH-A, CH-X |
| TEACH-CH-CITATION synthetic documentary source | CH | CH-S |
| TEACH-CH-DOCUMENTS synthetic documentary source | CH | CH-D |
| TEACH-CH-SPECTRUM synthetic documentary source | CH | CH-F |
| TEACH-CH-Z synthetic evidence | CH | None |
| TEACH-EU-DE-BASIS synthetic documentary source | EU-DE | EU-DE-J, EU-DE-R, EU-DE-A, EU-DE-X |
| TEACH-EU-DE-CITATION synthetic documentary source | EU-DE | EU-DE-S |
| TEACH-EU-DE-DOCUMENTS synthetic documentary source | EU-DE | EU-DE-D |
| TEACH-EU-DE-SPECTRUM synthetic documentary source | EU-DE | EU-DE-F |
| TEACH-EU-DE-Z synthetic evidence | EU-DE | None |
| TEACH-GB-BASIS synthetic documentary source | GB | GB-J, GB-R, GB-A, GB-X |
| TEACH-GB-CITATION synthetic documentary source | GB | GB-S |
| TEACH-GB-DOCUMENTS synthetic documentary source | GB | GB-D, NI-D |
| TEACH-GB-SPECTRUM synthetic documentary source | GB | GB-F |
| TEACH-GB-Z synthetic evidence | GB | None |
| TEACH-NI-BASIS synthetic documentary source | NI | NI-J, NI-R, NI-A, NI-X |
| TEACH-NI-CITATION synthetic documentary source | NI | NI-S |
| TEACH-NI-DOCUMENTS synthetic documentary source | NI | None |
| TEACH-NI-SPECTRUM synthetic documentary source | NI | NI-F |
| TEACH-NI-Z synthetic evidence | NI | None |
| TEACH-SHARED-REPORT synthetic evidence | shared | EU-DE-E, CH-E, GB-E, NI-E |
All 21 synthetic source cards and their dates
Every identifier below begins TEACH-. These records contain no official URLs or real review attestations. Their source role, scope, read-state, publication, entry, application, transition and review dates are independent fields.
TEACH-EU-DE-BASIS
- id
- TEACH-EU-DE-BASIS
- role
- synthetic documentary source
- territory
- EU-DE
- activity
- placing-on-market
- configuration
- shared
- gates 1
- J
- gates 2
- R
- gates 3
- A
- gates 4
- X
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-EU-DE-CITATION
- id
- TEACH-EU-DE-CITATION
- role
- synthetic documentary source
- territory
- EU-DE
- activity
- placing-on-market
- configuration
- shared
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-EU-DE-DOCUMENTS
- id
- TEACH-EU-DE-DOCUMENTS
- role
- synthetic documentary source
- territory
- EU-DE
- activity
- placing-on-market
- configuration
- shared
- gates 1
- D
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-EU-DE-SPECTRUM
- id
- TEACH-EU-DE-SPECTRUM
- role
- synthetic documentary source
- territory
- EU-DE
- activity
- placing-on-market
- configuration
- shared
- gates 1
- F
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-EU-DE-Z
- id
- TEACH-EU-DE-Z
- role
- synthetic evidence
- territory
- EU-DE
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Separate fictional feature-Z evidence, usable only if explicitly referenced and reviewed.
TEACH-CH-BASIS
- id
- TEACH-CH-BASIS
- role
- synthetic documentary source
- territory
- CH
- activity
- placing-on-market
- configuration
- shared
- gates 1
- J
- gates 2
- R
- gates 3
- A
- gates 4
- X
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-CH-CITATION
- id
- TEACH-CH-CITATION
- role
- synthetic documentary source
- territory
- CH
- activity
- placing-on-market
- configuration
- shared
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-CH-DOCUMENTS
- id
- TEACH-CH-DOCUMENTS
- role
- synthetic documentary source
- territory
- CH
- activity
- placing-on-market
- configuration
- shared
- gates 1
- D
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-CH-SPECTRUM
- id
- TEACH-CH-SPECTRUM
- role
- synthetic documentary source
- territory
- CH
- activity
- placing-on-market
- configuration
- shared
- gates 1
- F
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-CH-Z
- id
- TEACH-CH-Z
- role
- synthetic evidence
- territory
- CH
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Separate fictional feature-Z evidence, usable only if explicitly referenced and reviewed.
TEACH-GB-BASIS
- id
- TEACH-GB-BASIS
- role
- synthetic documentary source
- territory
- GB
- activity
- placing-on-market
- configuration
- shared
- gates 1
- J
- gates 2
- R
- gates 3
- A
- gates 4
- X
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-GB-CITATION
- id
- TEACH-GB-CITATION
- role
- synthetic documentary source
- territory
- GB
- activity
- placing-on-market
- configuration
- shared
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-GB-DOCUMENTS
- id
- TEACH-GB-DOCUMENTS
- role
- synthetic documentary source
- territory
- GB
- activity
- placing-on-market
- configuration
- shared
- gates 1
- D
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-GB-SPECTRUM
- id
- TEACH-GB-SPECTRUM
- role
- synthetic documentary source
- territory
- GB
- activity
- placing-on-market
- configuration
- shared
- gates 1
- F
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-GB-Z
- id
- TEACH-GB-Z
- role
- synthetic evidence
- territory
- GB
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Separate fictional feature-Z evidence, usable only if explicitly referenced and reviewed.
TEACH-NI-BASIS
- id
- TEACH-NI-BASIS
- role
- synthetic documentary source
- territory
- NI
- activity
- placing-on-market
- configuration
- shared
- gates 1
- J
- gates 2
- R
- gates 3
- A
- gates 4
- X
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-NI-CITATION
- id
- TEACH-NI-CITATION
- role
- synthetic documentary source
- territory
- NI
- activity
- placing-on-market
- configuration
- shared
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-NI-DOCUMENTS
- id
- TEACH-NI-DOCUMENTS
- role
- synthetic documentary source
- territory
- NI
- activity
- placing-on-market
- configuration
- shared
- gates 1
- D
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-NI-SPECTRUM
- id
- TEACH-NI-SPECTRUM
- role
- synthetic documentary source
- territory
- NI
- activity
- placing-on-market
- configuration
- shared
- gates 1
- F
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Fictional recorded support; not a legal source or actual reviewer attestation.
TEACH-NI-Z
- id
- TEACH-NI-Z
- role
- synthetic evidence
- territory
- NI
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- gates 1
- S
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- Separate fictional feature-Z evidence, usable only if explicitly referenced and reviewed.
TEACH-SHARED-REPORT
- id
- TEACH-SHARED-REPORT
- role
- synthetic evidence
- territory
- shared
- activity
- placing-on-market
- configuration
- TEACH-MAN-G02-v1
- gates 1
- E
- read
- read
- dates · publication
- 2026-01-01
- dates · entry Into Force
- Not assigned to this fictional source
- dates · application
- Not assigned; TEACH citation window is recorded separately
- dates · transition End
- No source-wide transition assigned
- dates · access
- 2026-09-08
- dates · reviewed
- 2026-09-08
- dates · review Due
- 2026-12-07
- version
- v1
- rationale
- One fictional report with four declared documentary scope relationships; legal reusability remains unevaluated.
Workload: 4/4 packets · 32/32 gates · 21/24 sources · 32/64 dependencies.
Read the source · audit a repair without transferring its conclusion
First repair GB’s actor alone and explain why NI is still challenged. Next repair all four gaps, then select “New manifest, old report”: identify the evidence-to-configuration dependency that breaks. Finally compare a fresh review with future citation support, and overdue review with an open support window. Name the date and source field responsible for each change.
Four territories, four next decisions
Scope: original Germany/Switzerland/GB launch retained; NI added for comparison. N01 and G03 node-only parents are preserved. G02-RU and the connected derivatives add proposed remote updates; optional cellular and simultaneous behavior remain unresolved. Actual market activity dates and legal entities are unknown.
| Territory / own record | Copied assumption corrected | Next decision and consequence |
|---|---|---|
| EU-DE · P09-M03-EU-DE-v1 | Newest PDF is not the official citation; row 16 traced with the newer EU amendment. | RF and compliance leads: lock G02 mode and N01 scope; map each requirement to evidence and Article 17 route. Add German national-use source. |
| CH · P09-M03-CH-v1 | EU dossier or carrier frequency does not settle Swiss interface and designation scope. | Swiss spectrum specialist: select applicable interface and inspect antenna, power/access controls and installation. Security lead: review OOIT Annex 1 against the connected variant. |
| GB · P09-M03-GB-v1 | A universal post-2024 UKCA cutoff is not the current radio-equipment basis. | GB supply-chain compliance lead: resolve the responsible actor/task, select and document the conformity basis under current law, then review designation/body/documents. |
| NI · P09-M03-NI-v1 | GB-only documentation cannot close NI; parent firmware remains unreviewed. | NI compliance specialist: replace the copied GB-only marking source; confirm actor/body and goods-status facts, then review F-GB-derived firmware suitability. |
Source/version record: RED consolidation 2026-05-30; EU citation consolidation 2025-12-11 plus 2026/2003; ETSI V2.2.2 (2019-07); Swiss TIO state 2024-08-15, OOIT state 2026-01-01 and designation FF 2025 3694; GB notice 0130/26 and current regulation extents; NI-specific guidance and Regulation 6A. Exact locators, actual access, limits and dates accompany each full record below.
Evidence decision: keep inherited ER-A/ER-D and M08-01-RAW-A / DERIVED-A at their original scope. No new report, signature or approval is created. The product team must supply mode, data, user and control facts; specialists may then change firmware, lab scope, instructions/labels or schedule. A proposed lab booking does not close the source or responsibility gaps.
Shared schema p09-compliance-register-v1 · own snapshot p09-m03-europe-register-v1. Illustrative project records below are separate from the TEACH comparator. Official-source review: 2026-09-09; real applicability and legal validity remain unevaluated.
| Record / parent | Product and activity | Applicability / evidence / next owner |
|---|---|---|
| P09-M03-EU-DE-v1 P09-M02-U1-v1, P09-M02-U5-v1, P09-M01-C09-v1 | SYN-MAN-N01-A0-P0-F-EU-node-TX-v1 Proposed placing on market; operation is a separate question | Applicability unknown · inherited fictional evidence · scope unknown · legal validity not evaluated EU/German compliance lead + RF lab |
| P09-M03-CH-v1 P09-M02-U7-v1, P09-M02-U8-v1, P09-M01-C10-v1 | SYN-MAN-G03-A1-P2-F-CH-node-TX-v1 Proposed placing on market; operation is a separate question | Applicability unknown · inherited fictional evidence · scope unknown · legal validity not evaluated Swiss spectrum specialist + security lead |
| P09-M03-GB-v1 P09-M02-U5-v1, P09-M01-C10-v1 | SYN-MAN-G02-A0-P2-F-GB-wifi-node-v1 Proposed placing on market; operation is a separate question | Applicability unknown · inherited fictional evidence · scope unknown · legal validity not evaluated GB supply-chain compliance lead |
| P09-M03-NI-v1 P09-M02-U5-v1, P09-M01-C10-v1 | SYN-MAN-G02-NI-COMPARE-v1 Added comparison: proposed placing on the NI market; original launch markets retained | Applicability unknown · inherited fictional evidence · scope unknown · legal validity not evaluated NI compliance specialist |
P09-M03-EU-DE-v1 · full configuration, authority, evidence and action snapshot
- id
- P09-M03-EU-DE-v1
- parent Ids 1
- P09-M02-U1-v1
- parent Ids 2
- P09-M02-U5-v1
- parent Ids 3
- P09-M01-C09-v1
- owning Module
- 09.3
- label
- Illustrative
- territory
- EU-DE
- activity
- Proposed placing on market; operation is a separate question
- activity Date
- Unknown / not established
- question
- Which RED requirements and German use conditions apply to the N01 baseline and the separately declared G02-RU gateway?
- product · id
- SYN-MAN-N01-A0-P0-F-EU-node-TX-v1
- product · parent Id
- SYN-P09-M01-MANIFEST-v1
- product · scenario
- teaching-node-v1
- product · sku
- N01
- product · hardware
- SYN-HW-N01-v1
- product · firmware
- SYN-FW-N01-F-EU-v1
- product · region
- F-EU
- product · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred.
- product · mode
- node-TX
- product · concurrent
- false
- product · antenna
- A0
- product · antenna Version
- SYN-A0-v1
- product · cable
- Internal fixed feed SYN-FEED-v1
- product · enclosure
- SYN-ENC-N01-v1
- product · supply
- P0
- product · supply Version
- SYN-P0-v1
- product · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- product · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- product · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- product · sample
- SYN-SAMPLE-N01-01
- product · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown
- product · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Comparison · id
- SYN-MAN-G02-RU-EU-v1
- connected Comparison · parent Id
- SYN-MAN-G02-A0-P2-F-GB-wifi-node-v1
- connected Comparison · scenario
- teaching-node-v1
- connected Comparison · sku
- G02
- connected Comparison · hardware
- SYN-HW-G02-v1
- connected Comparison · firmware
- SYN-FW-G02-F-EU-v1
- connected Comparison · region
- F-EU
- connected Comparison · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred. Named Wi-Fi option: exact standard, band/channel, power, bandwidth and duty unknown.
- connected Comparison · mode
- wifi-node
- connected Comparison · concurrent
- true
- connected Comparison · antenna
- A0
- connected Comparison · antenna Version
- SYN-A0-v1
- connected Comparison · cable
- Internal fixed feed SYN-FEED-v1
- connected Comparison · enclosure
- SYN-ENC-G02-v1
- connected Comparison · supply
- P2
- connected Comparison · supply Version
- SYN-P2-v1
- connected Comparison · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- connected Comparison · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- connected Comparison · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- connected Comparison · sample
- SYN-SAMPLE-G02-01
- connected Comparison · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown
- connected Comparison · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Facts
- Named connected condition-monitoring gateway, remote-update proposal RU-v1. G02 Wi-Fi and G03 optional cellular are declared capabilities, not known compliant modes. Internet route, data categories, payment/value functions, intended user/category, recovery/update controls and simultaneous RF states need evidence. The baseline N01 is unchanged.
- requirement Families 1
- Health / safety and RF exposure
- requirement Families 2
- EMC
- requirement Families 3
- Radio spectrum
- requirement Families 4
- Conditional additional requirements
- requirement Families 5
- Documentation / marking / actors
- requirement Families 6
- National operation; other applicable law referral
- applicability
- unknown
- applicability Rationale
- The source-reading exercise identifies plausible questions. The product facts, actual activity date and all applicable categories/exceptions have not been resolved; no real not-applicable determination is recorded.
- reviewer
- Named role only: jurisdiction compliance lead, supported by RF/safety/security specialists; no real approval attestation
- authority 1 · id
- RED
- authority 1 · issuer
- European Parliament and Council / EUR-Lex
- authority 1 · title
- Radio Equipment Directive 2014/53/EU
- authority 1 · role
- EU directive; consolidated reading text
- authority 1 · version
- Consolidation 2026-05-30; original act 2014-04-16
- authority 1 · locator
- Articles 1–3, 7, 10–14, 16–21; Annexes II–VII
- authority 1 · url
- https://eur-lex.europa.eu/eli/dir/2014/53/2026-05-30/eng
- authority 1 · language
- English
- authority 1 · claim
- Requirement families, manufacturer/operator duties, scoped presumption, assessment routes and documentation.
- authority 1 · limit
- Consolidation aids reading; authentic acts and national implementation govern. Product-specific scope, emergencies and other law are not decided here.
- authority 1 · trigger
- Amendment, product/configuration, territory, activity or route change
- authority 1 · publication
- Original OJ 2014-05-22
- authority 1 · application
- National measures generally apply from 2016-06-13; later provisions have separate dates
- authority 1 · transition
- Check the relevant amendment and product category
- authority 1 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 2 · id
- DE
- authority 2 · issuer
- German federal legislation portal
- authority 2 · title
- Funkanlagengesetz (FuAG), § 4
- authority 2 · role
- German national legislation
- authority 2 · version
- Current online § 4 at access
- authority 2 · locator
- § 4(1)–(4), essential requirements
- authority 2 · url
- https://www.gesetze-im-internet.de/fuag/__4.html
- authority 2 · language
- German; original English paraphrase here
- authority 2 · claim
- Germany is the declared EU market; its national requirement text must accompany the RED source chain.
- authority 2 · limit
- This paragraph is not a complete German market-access or operating-law review.
- authority 2 · trigger
- National amendment or different EU destination
- authority 2 · publication
- Version date not shown in the paragraph view
- authority 2 · application
- Activity-specific review required
- authority 2 · transition
- Not established for the illustrative product
- authority 2 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 3 · id
- EU-HS
- authority 3 · issuer
- European Commission / EUR-Lex
- authority 3 · title
- Implementing Decision (EU) 2022/2191
- authority 3 · role
- Official harmonised-standard references; consolidated reading text
- authority 3 · version
- Consolidation 2025-12-11, through 2025/2499; read with EU-NEW
- authority 3 · locator
- Article 1; Annex I row 16 (EN 300 328 V2.2.2), row 23 and rows 164–166 with notices
- authority 3 · url
- https://eur-lex.europa.eu/eli/dec_impl/2022/2191/2025-12-11/eng
- authority 3 · language
- English
- authority 3 · claim
- An exact cited edition and any limitation are distinct from the standards PDF.
- authority 3 · limit
- This consolidation alone omits 2026/2003. EN 18031 full technical text was not read; no clause-level assessment inferred.
- authority 3 · trigger
- New citation, correction, withdrawal or scope change
- authority 3 · publication
- Original 2022-11-10; consolidation date is not first citation date
- authority 3 · application
- Read each entry and amendment
- authority 3 · transition
- Entry-specific; no universal standards expiry
- authority 3 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 4 · id
- EU-NEW
- authority 4 · issuer
- European Commission / EUR-Lex
- authority 4 · title
- Implementing Decision (EU) 2026/2003
- authority 4 · role
- Authentic OJ amending and correcting act
- authority 4 · version
- Adopted 2026-09-04; in force at access
- authority 4 · locator
- Articles 1–3 and complete Annex points (1)–(3), rows 4b, 95a, 103a, 130a, 147a, 184–191
- authority 4 · url
- https://eur-lex.europa.eu/eli/dec_impl/2026/2003/oj
- authority 4 · language
- English
- authority 4 · claim
- Adds/revises named references and restrictions; corrects the earlier deletion reference. It does not amend row 16.
- authority 4 · limit
- A changed list does not mean every product needs a new test. Each changed scope needs review.
- authority 4 · trigger
- New OJ amendment or a product using an affected standard
- authority 4 · publication
- 2026-09-07
- authority 4 · application
- Entry into force on publication
- authority 4 · transition
- Annex point (1) withdrawals apply 2028-03-07
- authority 4 · entry Into Force
- 2026-09-07, publication; Article 3. Delayed withdrawals are separate.
- authority 5 · id
- ETSI
- authority 5 · issuer
- ETSI
- authority 5 · title
- EN 300 328 V2.2.2 (2019-07)
- authority 5 · role
- Technical standard text; not the citation instrument
- authority 5 · version
- V2.2.2; adopted 2019-07-01
- authority 5 · locator
- Cover, clause 1 (printed p. 10), Annex A and Table A.1 (printed p. 75)
- authority 5 · url
- https://www.etsi.org/deliver/etsi_en/300300_300399/300328/02.02.02_60/en_300328v020202p.pdf
- authority 5 · language
- English
- authority 5 · claim
- Scope concerns 2.4 GHz wideband data transmission equipment; Annex A maps requirements to RED Article 3(2).
- authority 5 · limit
- Candidate for an appropriately specified radio, not automatic coverage of the generic QPSK node or other requirement families. No product test performed.
- authority 5 · trigger
- Exact radio mode, edition, method, configuration or citation change
- authority 5 · publication
- 2019-07
- authority 5 · application
- Standard publication is not citation support
- authority 5 · transition
- See separate territory citation
- authority 5 · entry Into Force
- Not a legislative commencement; see the separate governing instrument.
- authority 6 · id
- EU-ADD
- authority 6 · issuer
- European Commission / EUR-Lex
- authority 6 · title
- Delegated Regulation (EU) 2022/30, as amended
- authority 6 · role
- Delegated legislation activating selected RED requirements
- authority 6 · version
- Consolidation 2023-10-27 incorporating 2023/2444
- authority 6 · locator
- Articles 1–3: categories, exceptions and application
- authority 6 · url
- https://eur-lex.europa.eu/eli/reg_del/2022/30/2023-10-27/eng
- authority 6 · language
- English
- authority 6 · claim
- Internet communication, data handling, listed categories and value-transfer functions answer different applicability questions.
- authority 6 · limit
- Connectivity alone does not answer every privacy/fraud row; review exceptions. Read alongside the enacted future repeal EU-REPEAL.
- authority 6 · trigger
- Category, data flow, connectivity, update or date change
- authority 6 · publication
- Original 2022-01-12
- authority 6 · application
- 2025-08-01 after amendment
- authority 6 · transition
- Repeal from 2027-12-11 under 2026/339
- authority 6 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 7 · id
- EU-REPEAL
- authority 7 · issuer
- European Commission / EUR-Lex
- authority 7 · title
- Delegated Regulation (EU) 2026/339
- authority 7 · role
- Enacted repeal with future application
- authority 7 · version
- Adopted 2026-02-16; published 2026-04-29
- authority 7 · locator
- Recital 5; Articles 1–2
- authority 7 · url
- https://eur-lex.europa.eu/eli/reg_del/2026/339/oj/eng
- authority 7 · language
- English
- authority 7 · claim
- Repeals 2022/30 with effect from 2027-12-11; earlier placing dates retain their own surveillance context.
- authority 7 · limit
- The repeal is enacted, not merely a proposal; its future effect does not erase present obligations or automatically amend Swiss law.
- authority 7 · trigger
- Activity date and subsequent amendment
- authority 7 · publication
- 2026-04-29
- authority 7 · application
- Repeal effective 2027-12-11
- authority 7 · transition
- Keep the earlier placing-on-market period distinct
- authority 7 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 8 · id
- CRA
- authority 8 · issuer
- European Parliament and Council / EUR-Lex
- authority 8 · title
- Cyber Resilience Act, Regulation (EU) 2024/2847
- authority 8 · role
- Separate EU legislation
- authority 8 · version
- Original OJ act of 2024-10-23
- authority 8 · locator
- Articles 2, 69 and 71; Article 14 reporting referral
- authority 8 · url
- https://eur-lex.europa.eu/eli/reg/2024/2847/oj/eng
- authority 8 · language
- English
- authority 8 · claim
- The security review has a separate legislative timeline; Article 71 differentiates main application, reporting and body provisions.
- authority 8 · limit
- No CRA classification or security sufficiency determined. Product and transition scope require specialist review.
- authority 8 · trigger
- Product/security support model, placing date or amendment
- authority 8 · publication
- 2024-11-20
- authority 8 · application
- Main 2027-12-11; Article 14 2026-09-11; Chapter IV 2026-06-11
- authority 8 · transition
- Article 69 requires a separate transition review
- authority 8 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- standard Method
- EN 300 328 V2.2.2 is a candidate for a suitably specified 2.4 GHz wideband data mode of G02-RU. EU Annex I row 16 is verified; generic node scope and all other families remain unresolved.
- technical Value Definition
- Documentary review only: no legal RF limit, detector, measurement bandwidth, distance, statistic or measured result assigned. Inherited 2.450 GHz QPSK values identify the waveform at D3, not a permitted radio technology.
- uncertainty Decision Rule
- No measurement decision. M08-01-RAW-A / DERIVED-A remain scoped teaching evidence with their original planes and uncertainty; no conversion into conformity evidence.
- actor
- Proposed own-name manufacturer; actual legal entity, establishment, importer/distributor chain and transaction unresolved
- responsibility
- Manufacturer retains product/assessment/documentation responsibility; territory-specific actors must be assigned. Lab or body work does not itself assign the market role.
- body Question
- RED Article 17 route review per requirement; no body or mandate selected.
- evidence 1 · id
- ER-A
- evidence 1 · role
- Inherited fictional report reference from 09.2; no new territorial or requirement coverage inferred
- evidence 1 · version
- v1
- evidence 1 · scope
- Original U1/U3 scope only
- evidence Maturity
- Inherited illustrative formal metadata, not an actual report; no new test or body evidence
- scope Match
- unknown
- source Review
- Official text at cited locators read 2026-09-09; technical and product-specific gaps retained
- legal Validity
- not evaluated
- document Marking Question
- Manufacturer risk assessment, technical file, declaration, instructions/limitations and CE marking require an actual product-specific review.
- spectrum Question
- Identify the actual German interface/general assignment for each final radio mode; no national-use closure is supplied.
- unresolved 1
- Identify the actual German interface/general assignment for each final radio mode; no national-use closure is supplied.
- unresolved 2
- Exact product category, radio mode, bands/channel, bandwidth, power/statistic and access/duty behavior
- unresolved 3
- Real actor, transaction, installation, separation, foreseeable use and activity date
- unresolved 4
- Remote-update design, data/value flows, optional cellular and reachable concurrent states
- unresolved 5
- Evidence sufficiency, language, current citations/restrictions, assessment route and body involvement
- next Action
- RF and compliance leads: lock G02 mode and N01 scope; map each requirement to evidence and Article 17 route. Add German national-use source.
- next Owner
- EU/German compliance lead + RF lab
- change Dependencies 1
- territory/activity/date
- change Dependencies 2
- SKU/hardware/sample
- change Dependencies 3
- firmware/region/recovery/update
- change Dependencies 4
- radio mode/concurrency
- change Dependencies 5
- antenna/cable/enclosure
- change Dependencies 6
- supply/accessories
- change Dependencies 7
- installation/user/data/category
- change Dependencies 8
- source revision/citation/restriction
- change Dependencies 9
- actor/body/document/mark
- dates · actual Access
- 2026-09-09
- dates · actual Review
- 2026-09-09
- dates · editorial Recheck
- Before use and on any dependency change; target 2026-12-07 is editorial only
- dates · activity
- Unknown / not established
- dates · synthetic Report Review
- Inherited fixture 2026-09-08; not an actual attestation
- dates · publication
- Recorded separately on each complete authority card
- dates · entry Into Force
- Recorded separately on each authority card; unverified commencement remains open
- dates · application
- Read the provision for the actual product, territory and activity date
- dates · transition
- Keep entry-specific and activity-specific transition conditions; no date inferred from source review
- inherited Records 1
- teaching-node-v1
- inherited Records 2
- NEED-08
- inherited Records 3
- C-MARKET
- inherited Records 4
- M08-01-RAW-A
- inherited Records 5
- M08-01-DERIVED-A
- inherited Records 6
- P09-M01-C09-v1
- inherited Records 7
- P09-M01-C10-v1
P09-M03-CH-v1 · full configuration, authority, evidence and action snapshot
- id
- P09-M03-CH-v1
- parent Ids 1
- P09-M02-U7-v1
- parent Ids 2
- P09-M02-U8-v1
- parent Ids 3
- P09-M01-C10-v1
- owning Module
- 09.3
- label
- Illustrative
- territory
- CH
- activity
- Proposed placing on market; operation is a separate question
- activity Date
- Unknown / not established
- question
- What Swiss requirements, documents and frequency conditions cover G03 in node-only state, and what changes with remote connectivity?
- product · id
- SYN-MAN-G03-A1-P2-F-CH-node-TX-v1
- product · parent Id
- SYN-P09-M01-MANIFEST-v1
- product · scenario
- teaching-node-v1
- product · sku
- G03
- product · hardware
- SYN-HW-G03-v1
- product · firmware
- SYN-FW-G03-F-CH-v1
- product · region
- F-CH
- product · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred. Named cellular option: exact release, bands, power and duty unknown.
- product · mode
- node-TX
- product · concurrent
- false
- product · antenna
- A1
- product · antenna Version
- SYN-A1-v1
- product · cable
- External coax SYN-COAX-v1, 0.20 m; pattern/gain/loss evidence unknown
- product · enclosure
- SYN-ENC-G03-v1
- product · supply
- P2
- product · supply Version
- SYN-P2-v1
- product · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- product · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- product · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- product · sample
- SYN-SAMPLE-G03-01
- product · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown
- product · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Comparison · id
- SYN-MAN-G03-RU-CH-v1
- connected Comparison · parent Id
- SYN-MAN-G03-A1-P2-F-CH-node-TX-v1
- connected Comparison · scenario
- teaching-node-v1
- connected Comparison · sku
- G03
- connected Comparison · hardware
- SYN-HW-G03-v1
- connected Comparison · firmware
- SYN-FW-G03-F-CH-v1
- connected Comparison · region
- F-CH
- connected Comparison · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred. Named cellular option: exact release, bands, power and duty unknown.
- connected Comparison · mode
- node-TX
- connected Comparison · concurrent
- false
- connected Comparison · antenna
- A1
- connected Comparison · antenna Version
- SYN-A1-v1
- connected Comparison · cable
- External coax SYN-COAX-v1, 0.20 m; pattern/gain/loss evidence unknown
- connected Comparison · enclosure
- SYN-ENC-G03-v1
- connected Comparison · supply
- P2
- connected Comparison · supply Version
- SYN-P2-v1
- connected Comparison · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- connected Comparison · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- connected Comparison · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- connected Comparison · sample
- SYN-SAMPLE-G03-01
- connected Comparison · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown
- connected Comparison · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Facts
- Named connected condition-monitoring gateway, remote-update proposal RU-v1. G02 Wi-Fi and G03 optional cellular are declared capabilities, not known compliant modes. Internet route, data categories, payment/value functions, intended user/category, recovery/update controls and simultaneous RF states need evidence. The baseline N01 is unchanged.
- requirement Families 1
- Health / safety and RF exposure
- requirement Families 2
- EMC
- requirement Families 3
- Radio spectrum
- requirement Families 4
- Conditional additional requirements
- requirement Families 5
- Documentation / marking / actors
- requirement Families 6
- National operation; other applicable law referral
- applicability
- unknown
- applicability Rationale
- The source-reading exercise identifies plausible questions. The product facts, actual activity date and all applicable categories/exceptions have not been resolved; no real not-applicable determination is recorded.
- reviewer
- Named role only: jurisdiction compliance lead, supported by RF/safety/security specialists; no real approval attestation
- authority 1 · id
- CH-TIO
- authority 1 · issuer
- Swiss Federal Council / Fedlex
- authority 1 · title
- Telecommunications Installations Ordinance (OIT/TIO), SR 784.101.2
- authority 1 · role
- Swiss legislation
- authority 1 · version
- Ordinance 2015-11-25; current text state 2024-08-15
- authority 1 · locator
- Articles 1–2, 7, 12–19; assessment, technical file, declaration, retention, marking and information
- authority 1 · url
- https://www.fedlex.admin.ch/eli/cc/2016/24/fr
- authority 1 · language
- French legal text; original English paraphrase here
- authority 1 · claim
- Swiss requirements and procedures, documentation and marking have a Swiss legal source even where their structure is similar to RED.
- authority 1 · limit
- Read current French text; English access did not yield the same readable text. Actual actor and future amendments need scope review.
- authority 1 · trigger
- TIO version, hardware/software, actor or intended-use change
- authority 1 · publication
- Original RO 2016 179
- authority 1 · application
- Original entry 2016-06-13; current-state amendments separately dated
- authority 1 · transition
- Future version listed for 2028-07-01 is not the current text
- authority 1 · entry Into Force
- Original ordinance 2016-06-13; later amendments have separate commencement dates.
- authority 2 · id
- CH-OOIT
- authority 2 · issuer
- Swiss OFCOM / Fedlex
- authority 2 · title
- OFCOM ordinance (OOIT), SR 784.101.21
- authority 2 · role
- Swiss implementing legislation
- authority 2 · version
- Ordinance 2016-05-26; current state 2026-01-01
- authority 2 · locator
- Articles 1, 2, 2a, 10b; Annex 1 rows 7–9
- authority 2 · url
- https://www.fedlex.admin.ch/eli/cc/2016/307/fr
- authority 2 · language
- French legal text; original English paraphrase here
- authority 2 · claim
- Additional requirements and the Swiss transition are recorded in Swiss legislation; interfaces have their own legal references.
- authority 2 · limit
- Do not apply the EU repeal date to this text by analogy.
- authority 2 · trigger
- OFCOM amendment, category/data facts or activity change
- authority 2 · publication
- Original RO 2016 1673
- authority 2 · application
- Article 10b allowed affected nonconforming equipment to be placed through 2025-07-31
- authority 2 · transition
- Read each affected category and any subsequent Swiss measure
- authority 2 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 3 · id
- CH-STANDARDS
- authority 3 · issuer
- Swiss OFCOM / Fedlex
- authority 3 · title
- Designation of technical standards, FF 2025 3694
- authority 3 · role
- Swiss official designation notice
- authority 3 · version
- Decision and publication 2025-12-30; current notice linked by OFCOM at access
- authority 3 · locator
- Sections 1.2, 2.1, 4.2 and 5
- authority 3 · url
- https://www.fedlex.admin.ch/eli/fga/2025/3694/fr
- authority 3 · language
- French; original English paraphrase here
- authority 3 · claim
- Designates the referenced EU publications through 2025/2499 and maps essential requirements; its informative consolidated list has no legal effect.
- authority 3 · limit
- This notice does not itself establish Swiss adoption of the later EU 2026/2003 amendment. Recheck before using a changed entry.
- authority 3 · trigger
- New OFCOM designation or EU citation amendment
- authority 3 · publication
- 2025-12-30
- authority 3 · application
- Designation in the notice
- authority 3 · transition
- Read the referenced entries and replacement notice
- authority 3 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 4 · id
- CH-RIR
- authority 4 · issuer
- Swiss OFCOM
- authority 4 · title
- RIR1010-01: wideband data transmission systems
- authority 4 · role
- National radio interface regulation
- authority 4 · version
- Edition 6.0 / 01.08.2018 displayed at access
- authority 4 · locator
- Rows 1–11 normative, especially 2 and 7–9; rows 12–15 informative
- authority 4 · url
- https://www.ofcomnet.ch/api/rir/1010/01
- authority 4 · language
- English
- authority 4 · claim
- Application, antenna, access conditions and licensing/use scope must match the actual radio; the interface covers Switzerland and Liechtenstein.
- authority 4 · limit
- A 2.450 GHz carrier alone does not select this interface. Unversioned standard mentions do not prove edition-specific designation.
- authority 4 · trigger
- Radio mode, antenna, access controls, installation or RIR revision
- authority 4 · publication
- Edition date 2018-08-01
- authority 4 · application
- Read current interface and intended use
- authority 4 · transition
- No product-specific permission established
- authority 4 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 5 · id
- CH-DOC
- authority 5 · issuer
- Swiss OFCOM
- authority 5 · title
- Declaration of conformity (EU)
- authority 5 · role
- Official Swiss documentation guidance
- authority 5 · version
- Published 2023-12-11
- authority 5 · locator
- Full/simplified declaration, language and accessory/software scope
- authority 5 · url
- https://www.bakom.admin.ch/en/declaration-of-conformity-eu
- authority 5 · language
- English
- authority 5 · claim
- The Swiss dossier must cover the intended configuration and the applicable declaration/language conditions.
- authority 5 · limit
- No declaration, signature or approval is generated by this lesson.
- authority 5 · trigger
- Product, software, accessories or language/market change
- authority 5 · publication
- 2023-12-11
- authority 5 · application
- Guidance; read the TIO
- authority 5 · transition
- Not a statutory expiry
- authority 5 · entry Into Force
- Not a legislative commencement; see the separate governing instrument.
- standard Method
- Swiss notice FF 2025 3694 designates referenced EU publications through 2025/2499. Exact product scope remains unknown; do not assume later EU amendments are already designated.
- technical Value Definition
- Documentary review only: no legal RF limit, detector, measurement bandwidth, distance, statistic or measured result assigned. Inherited 2.450 GHz QPSK values identify the waveform at D3, not a permitted radio technology.
- uncertainty Decision Rule
- No measurement decision. M08-01-RAW-A / DERIVED-A remain scoped teaching evidence with their original planes and uncertainty; no conversion into conformity evidence.
- actor
- Proposed own-name manufacturer; actual legal entity, establishment, importer/distributor chain and transaction unresolved
- responsibility
- Manufacturer retains product/assessment/documentation responsibility; territory-specific actors must be assigned. Lab or body work does not itself assign the market role.
- body Question
- Review TIO Article 13 for each requirement and the recognition/scope of any proposed assessment body.
- evidence 1 · id
- ER-D
- evidence 1 · role
- Inherited fictional report reference from 09.2; no new territorial or requirement coverage inferred
- evidence 1 · version
- v1
- evidence 1 · scope
- Original U7 node-only spectrum scope only
- evidence Maturity
- Inherited illustrative formal metadata, not an actual report; no new test or body evidence
- scope Match
- unknown
- source Review
- Official text at cited locators read 2026-09-09; technical and product-specific gaps retained
- legal Validity
- not evaluated
- document Marking Question
- TIO Articles 14–19: configuration-aware dossier, declaration, language, identity, marking and user information. No signed declaration supplied.
- spectrum Question
- RIR1010-01 is a candidate only if the actual mode fits wideband-data scope; antenna, access controls and use conditions remain unknown for G03 node-only.
- unresolved 1
- RIR1010-01 is a candidate only if the actual mode fits wideband-data scope; antenna, access controls and use conditions remain unknown for G03 node-only.
- unresolved 2
- Exact product category, radio mode, bands/channel, bandwidth, power/statistic and access/duty behavior
- unresolved 3
- Real actor, transaction, installation, separation, foreseeable use and activity date
- unresolved 4
- Remote-update design, data/value flows, optional cellular and reachable concurrent states
- unresolved 5
- Evidence sufficiency, language, current citations/restrictions, assessment route and body involvement
- next Action
- Swiss spectrum specialist: select applicable interface and inspect antenna, power/access controls and installation. Security lead: review OOIT Annex 1 against the connected variant.
- next Owner
- Swiss spectrum specialist + security lead
- change Dependencies 1
- territory/activity/date
- change Dependencies 2
- SKU/hardware/sample
- change Dependencies 3
- firmware/region/recovery/update
- change Dependencies 4
- radio mode/concurrency
- change Dependencies 5
- antenna/cable/enclosure
- change Dependencies 6
- supply/accessories
- change Dependencies 7
- installation/user/data/category
- change Dependencies 8
- source revision/citation/restriction
- change Dependencies 9
- actor/body/document/mark
- dates · actual Access
- 2026-09-09
- dates · actual Review
- 2026-09-09
- dates · editorial Recheck
- Before use and on any dependency change; target 2026-12-07 is editorial only
- dates · activity
- Unknown / not established
- dates · synthetic Report Review
- Inherited fixture 2026-09-08; not an actual attestation
- dates · publication
- Recorded separately on each complete authority card
- dates · entry Into Force
- Recorded separately on each authority card; unverified commencement remains open
- dates · application
- Read the provision for the actual product, territory and activity date
- dates · transition
- Keep entry-specific and activity-specific transition conditions; no date inferred from source review
- inherited Records 1
- teaching-node-v1
- inherited Records 2
- NEED-08
- inherited Records 3
- C-MARKET
- inherited Records 4
- M08-01-RAW-A
- inherited Records 5
- M08-01-DERIVED-A
- inherited Records 6
- P09-M01-C09-v1
- inherited Records 7
- P09-M01-C10-v1
P09-M03-GB-v1 · full configuration, authority, evidence and action snapshot
- id
- P09-M03-GB-v1
- parent Ids 1
- P09-M02-U5-v1
- parent Ids 2
- P09-M01-C10-v1
- owning Module
- 09.3
- label
- Illustrative
- territory
- GB
- activity
- Proposed placing on market; operation is a separate question
- activity Date
- Unknown / not established
- question
- Which current GB conformity basis, responsible actor and marking/document conditions cover G02?
- product · id
- SYN-MAN-G02-A0-P2-F-GB-wifi-node-v1
- product · parent Id
- SYN-P09-M01-MANIFEST-v1
- product · scenario
- teaching-node-v1
- product · sku
- G02
- product · hardware
- SYN-HW-G02-v1
- product · firmware
- SYN-FW-G02-F-GB-v1
- product · region
- F-GB
- product · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred. Named Wi-Fi option: exact standard, band/channel, power, bandwidth and duty unknown.
- product · mode
- wifi-node
- product · concurrent
- true
- product · antenna
- A0
- product · antenna Version
- SYN-A0-v1
- product · cable
- Internal fixed feed SYN-FEED-v1
- product · enclosure
- SYN-ENC-G02-v1
- product · supply
- P2
- product · supply Version
- SYN-P2-v1
- product · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- product · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- product · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- product · sample
- SYN-SAMPLE-G02-01
- product · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown
- product · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Comparison · id
- SYN-MAN-G02-RU-GB-v1
- connected Comparison · parent Id
- SYN-MAN-G02-A0-P2-F-GB-wifi-node-v1
- connected Comparison · scenario
- teaching-node-v1
- connected Comparison · sku
- G02
- connected Comparison · hardware
- SYN-HW-G02-v1
- connected Comparison · firmware
- SYN-FW-G02-F-GB-v1
- connected Comparison · region
- F-GB
- connected Comparison · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred. Named Wi-Fi option: exact standard, band/channel, power, bandwidth and duty unknown.
- connected Comparison · mode
- wifi-node
- connected Comparison · concurrent
- true
- connected Comparison · antenna
- A0
- connected Comparison · antenna Version
- SYN-A0-v1
- connected Comparison · cable
- Internal fixed feed SYN-FEED-v1
- connected Comparison · enclosure
- SYN-ENC-G02-v1
- connected Comparison · supply
- P2
- connected Comparison · supply Version
- SYN-P2-v1
- connected Comparison · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- connected Comparison · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- connected Comparison · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- connected Comparison · sample
- SYN-SAMPLE-G02-01
- connected Comparison · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown
- connected Comparison · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Facts
- Named connected condition-monitoring gateway, remote-update proposal RU-v1. G02 Wi-Fi and G03 optional cellular are declared capabilities, not known compliant modes. Internet route, data categories, payment/value functions, intended user/category, recovery/update controls and simultaneous RF states need evidence. The baseline N01 is unchanged.
- requirement Families 1
- Health / safety and RF exposure
- requirement Families 2
- EMC
- requirement Families 3
- Radio spectrum
- requirement Families 4
- Conditional additional requirements
- requirement Families 5
- Documentation / marking / actors
- requirement Families 6
- National operation; other applicable law referral
- applicability
- unknown
- applicability Rationale
- The source-reading exercise identifies plausible questions. The product facts, actual activity date and all applicable categories/exceptions have not been resolved; no real not-applicable determination is recorded.
- reviewer
- Named role only: jurisdiction compliance lead, supported by RF/safety/security specialists; no real approval attestation
- authority 1 · id
- GB-LAW
- authority 1 · issuer
- UK legislation portal
- authority 1 · title
- Radio Equipment Regulations 2017, SI 2017/1206
- authority 1 · role
- UK legislation with territorial extent
- authority 1 · version
- Latest revised text accessed 2026-09-09; outstanding-change notices retained
- authority 1 · locator
- Regulations 36A and 41; separate GB/NI extents
- authority 1 · url
- https://www.legislation.gov.uk/uksi/2017/1206/regulation/36A
- authority 1 · language
- English
- authority 1 · claim
- GB recognition is conditional: Regulation 36A includes documentation and exact corresponding-standard provisions; Regulation 41 distinguishes requirement families.
- authority 1 · limit
- Future/outstanding changes and the exact activity need review; a CE logo alone does not demonstrate these conditions.
- authority 1 · trigger
- Legislative amendment, conformity basis, actor or activity date
- authority 1 · publication
- Original SI 2017/1206; revised text has separate amendment dates
- authority 1 · application
- Read current extent and conditions
- authority 1 · transition
- No generic 2024 CE cutoff inferred
- authority 1 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 2 · id
- GB-AMEND
- authority 2 · issuer
- UK legislation portal
- authority 2 · title
- Product Safety and Metrology etc. (Amendment) Regulations 2024, SI 2024/696
- authority 2 · role
- Enacted amending legislation
- authority 2 · version
- 2024 instrument
- authority 2 · locator
- Commencement and regulation 20 (radio equipment amendments)
- authority 2 · url
- https://www.legislation.gov.uk/uksi/2024/696/pdfs/uksi_20240696_en.pdf
- authority 2 · language
- English
- authority 2 · claim
- The continuing GB recognition has an enacted measure behind the policy/guidance.
- authority 2 · limit
- Read the resulting radio-equipment provisions; the instrument is not proof that this product satisfies them.
- authority 2 · trigger
- Subsequent amendment or product scope change
- authority 2 · publication
- 2024 instrument
- authority 2 · application
- 2024-10-01
- authority 2 · transition
- Radio-equipment amendments remove the relevant time limit
- authority 2 · entry Into Force
- 2024-10-01; commencement of the 2024 amending instrument.
- authority 3 · id
- GB-GUIDE
- authority 3 · issuer
- UK Office for Product Safety and Standards
- authority 3 · title
- Radio Equipment Regulations 2017: Great Britain
- authority 3 · role
- Official GB guidance
- authority 3 · version
- March 2025 guidance; collection updated 2025-12-16
- authority 3 · locator
- Manufacturer/importer duties, conformity and marking sections including section 9
- authority 3 · url
- https://www.gov.uk/government/publications/radio-equipment-regulations-2017/radio-equipment-regulations-2017-great-britain
- authority 3 · language
- English
- authority 3 · claim
- GB permits the applicable CE-recognition route alongside UKCA; role, conformity evidence and documents still matter.
- authority 3 · limit
- Guidance explains the law; product-specific recognition and body conditions need review.
- authority 3 · trigger
- Marking choice, actor, body, law or designated-standard change
- authority 3 · publication
- Guidance headed March 2025
- authority 3 · application
- Radio-equipment CE recognition continues beyond 2024
- authority 3 · transition
- Conditions remain; “indefinite” does not freeze legislation
- authority 3 · entry Into Force
- Not a legislative commencement; see the separate governing instrument.
- authority 4 · id
- GB-NOTICE
- authority 4 · issuer
- UK government
- authority 4 · title
- Designated standards notice 0130/26
- authority 4 · role
- GB official designation notice
- authority 4 · version
- 21 January 2026; 28-page PDF
- authority 4 · locator
- Territorial header; Annex I part 1 row 16, printed p. 4
- authority 4 · url
- https://assets.publishing.service.gov.uk/media/696f8590c0f4afaa9536a0be/ds-0130-26-radio-equipment-notice.pdf
- authority 4 · language
- English
- authority 4 · claim
- EN 300 328 V2.2.2 is a separate GB entry; the same edition also appears in the EU reference used here.
- authority 4 · limit
- This is not NI’s citation source or a declaration about the sample. Read other rows for their restrictions/withdrawals.
- authority 4 · trigger
- New GB notice or changed product/edition
- authority 4 · publication
- 2026-01-21
- authority 4 · application
- Notice 0130/26, England/Wales/Scotland
- authority 4 · transition
- Entry-specific; no blanket standards expiry
- authority 4 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- standard Method
- Notice 0130/26 separately includes EN 300 328 V2.2.2. Check the claimed requirement, full intended mode and any exact correspondence condition for the chosen basis.
- technical Value Definition
- Documentary review only: no legal RF limit, detector, measurement bandwidth, distance, statistic or measured result assigned. Inherited 2.450 GHz QPSK values identify the waveform at D3, not a permitted radio technology.
- uncertainty Decision Rule
- No measurement decision. M08-01-RAW-A / DERIVED-A remain scoped teaching evidence with their original planes and uncertainty; no conversion into conformity evidence.
- actor
- Proposed own-name manufacturer; actual legal entity, establishment, importer/distributor chain and transaction unresolved
- responsibility
- Manufacturer retains product/assessment/documentation responsibility; territory-specific actors must be assigned. Lab or body work does not itself assign the market role.
- body Question
- Review current Regulation 36A / 41 conditions and appropriate body status; CE-recognition versus UKCA remains an open documented choice.
- evidence 1 · id
- ER-D
- evidence 1 · role
- Inherited fictional report reference from 09.2; no new territorial or requirement coverage inferred
- evidence 1 · version
- v1
- evidence 1 · scope
- Original U5 EMC scope only
- evidence Maturity
- Inherited illustrative formal metadata, not an actual report; no new test or body evidence
- scope Match
- unknown
- source Review
- Official text at cited locators read 2026-09-09; technical and product-specific gaps retained
- legal Validity
- not evaluated
- document Marking Question
- Assign actual manufacturer/importer roles and review the selected basis’s declaration, English documentation and marking conditions.
- spectrum Question
- A GB designation is not an Ofcom spectrum authorization. Obtain the actual band/interface and licensing or exemption conditions.
- unresolved 1
- A GB designation is not an Ofcom spectrum authorization. Obtain the actual band/interface and licensing or exemption conditions.
- unresolved 2
- Exact product category, radio mode, bands/channel, bandwidth, power/statistic and access/duty behavior
- unresolved 3
- Real actor, transaction, installation, separation, foreseeable use and activity date
- unresolved 4
- Remote-update design, data/value flows, optional cellular and reachable concurrent states
- unresolved 5
- Evidence sufficiency, language, current citations/restrictions, assessment route and body involvement
- next Action
- GB supply-chain compliance lead: resolve the responsible actor/task, select and document the conformity basis under current law, then review designation/body/documents.
- next Owner
- GB supply-chain compliance lead
- change Dependencies 1
- territory/activity/date
- change Dependencies 2
- SKU/hardware/sample
- change Dependencies 3
- firmware/region/recovery/update
- change Dependencies 4
- radio mode/concurrency
- change Dependencies 5
- antenna/cable/enclosure
- change Dependencies 6
- supply/accessories
- change Dependencies 7
- installation/user/data/category
- change Dependencies 8
- source revision/citation/restriction
- change Dependencies 9
- actor/body/document/mark
- dates · actual Access
- 2026-09-09
- dates · actual Review
- 2026-09-09
- dates · editorial Recheck
- Before use and on any dependency change; target 2026-12-07 is editorial only
- dates · activity
- Unknown / not established
- dates · synthetic Report Review
- Inherited fixture 2026-09-08; not an actual attestation
- dates · publication
- Recorded separately on each complete authority card
- dates · entry Into Force
- Recorded separately on each authority card; unverified commencement remains open
- dates · application
- Read the provision for the actual product, territory and activity date
- dates · transition
- Keep entry-specific and activity-specific transition conditions; no date inferred from source review
- inherited Records 1
- teaching-node-v1
- inherited Records 2
- NEED-08
- inherited Records 3
- C-MARKET
- inherited Records 4
- M08-01-RAW-A
- inherited Records 5
- M08-01-DERIVED-A
- inherited Records 6
- P09-M01-C09-v1
- inherited Records 7
- P09-M01-C10-v1
P09-M03-NI-v1 · full configuration, authority, evidence and action snapshot
- id
- P09-M03-NI-v1
- parent Ids 1
- P09-M02-U5-v1
- parent Ids 2
- P09-M01-C10-v1
- owning Module
- 09.3
- label
- Illustrative
- territory
- NI
- activity
- Added comparison: proposed placing on the NI market; original launch markets retained
- activity Date
- Unknown / not established
- question
- How does the added NI comparison change G02 actor, body and marking-source questions?
- product · id
- SYN-MAN-G02-NI-COMPARE-v1
- product · parent Id
- SYN-MAN-G02-A0-P2-F-GB-wifi-node-v1
- product · scenario
- teaching-node-v1
- product · sku
- G02
- product · hardware
- SYN-HW-G02-v1
- product · firmware
- SYN-FW-G02-F-GB-v1
- product · region
- F-GB
- product · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred. Named Wi-Fi option: exact standard, band/channel, power, bandwidth and duty unknown.
- product · mode
- wifi-node
- product · concurrent
- true
- product · antenna
- A0
- product · antenna Version
- SYN-A0-v1
- product · cable
- Internal fixed feed SYN-FEED-v1
- product · enclosure
- SYN-ENC-G02-v1
- product · supply
- P2
- product · supply Version
- SYN-P2-v1
- product · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- product · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- product · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- product · sample
- SYN-SAMPLE-G02-01
- product · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown NI is an added comparison market; this F-GB image has not been established as suitable for NI.
- product · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Comparison · id
- SYN-MAN-G02-RU-NI-v1
- connected Comparison · parent Id
- SYN-MAN-G02-NI-COMPARE-v1
- connected Comparison · scenario
- teaching-node-v1
- connected Comparison · sku
- G02
- connected Comparison · hardware
- SYN-HW-G02-v1
- connected Comparison · firmware
- SYN-FW-G02-F-GB-v1
- connected Comparison · region
- F-GB
- connected Comparison · radios
- Node: generic 2.450 GHz QPSK; 20 kbit/s information, 10 ksymbol/s, RRC α=0.35, 80 ksample/s D3; no standardized mode inferred. Named Wi-Fi option: exact standard, band/channel, power, bandwidth and duty unknown.
- connected Comparison · mode
- wifi-node
- connected Comparison · concurrent
- true
- connected Comparison · antenna
- A0
- connected Comparison · antenna Version
- SYN-A0-v1
- connected Comparison · cable
- Internal fixed feed SYN-FEED-v1
- connected Comparison · enclosure
- SYN-ENC-G02-v1
- connected Comparison · supply
- P2
- connected Comparison · supply Version
- SYN-P2-v1
- connected Comparison · installation
- SYN-INSTALL-v1: indoor fixed bracket proposed; separation, mobility during service and outdoor use unresolved
- connected Comparison · user
- SYN-USER-v1: technician installer and general end user proposed; access/service conditions unresolved
- connected Comparison · environment
- 25 °C bench identity only; operational temperature, humidity and foreseeable environment unresolved
- connected Comparison · sample
- SYN-SAMPLE-G02-01
- connected Comparison · region Control
- SYN-REGION-v1: four build images exist; signed configuration, recovery and forbidden-state reachability evidence unknown NI is an added comparison market; this F-GB image has not been established as suitable for NI.
- connected Comparison · test Image Relation
- SYN-TEST-v1 mapped to production image ID; radio-state equivalence and command limits need reviewer evidence
- connected Facts
- Named connected condition-monitoring gateway, remote-update proposal RU-v1. G02 Wi-Fi and G03 optional cellular are declared capabilities, not known compliant modes. Internet route, data categories, payment/value functions, intended user/category, recovery/update controls and simultaneous RF states need evidence. The baseline N01 is unchanged.
- requirement Families 1
- Health / safety and RF exposure
- requirement Families 2
- EMC
- requirement Families 3
- Radio spectrum
- requirement Families 4
- Conditional additional requirements
- requirement Families 5
- Documentation / marking / actors
- requirement Families 6
- National operation; other applicable law referral
- applicability
- unknown
- applicability Rationale
- The source-reading exercise identifies plausible questions. The product facts, actual activity date and all applicable categories/exceptions have not been resolved; no real not-applicable determination is recorded.
- reviewer
- Named role only: jurisdiction compliance lead, supported by RF/safety/security specialists; no real approval attestation
- authority 1 · id
- NI-GUIDE
- authority 1 · issuer
- UK Office for Product Safety and Standards
- authority 1 · title
- Radio Equipment Regulations 2017: Northern Ireland
- authority 1 · role
- Official NI guidance
- authority 1 · version
- Collection updated 2025-12-16; live NI text at access
- authority 1 · locator
- Economic operators; conformity assessment/marking; sections 14–16
- authority 1 · url
- https://www.gov.uk/government/publications/radio-equipment-regulations-2017/radio-equipment-regulations-2017-northern-ireland
- authority 1 · language
- English
- authority 1 · claim
- NI needs CE; mandatory assessment by a UK notified body adds UKNI. CE+UKNI does not provide EEA access; qualifying-NI access to GB is separate.
- authority 1 · limit
- Actual body role, territory scope and qualifying-goods status are unresolved for this case.
- authority 1 · trigger
- Actor/body location, assessment route, NI status or law change
- authority 1 · publication
- Live guidance; collection update is not commencement
- authority 1 · application
- Check NI law for the activity date
- authority 1 · transition
- Do not copy GB marking logic
- authority 1 · entry Into Force
- Not a legislative commencement; see the separate governing instrument.
- authority 2 · id
- NI-LAW
- authority 2 · issuer
- UK legislation portal
- authority 2 · title
- Radio Equipment Regulations 2017, regulation 6A
- authority 2 · role
- Territorially differentiated legislation
- authority 2 · version
- Revised NI provisions include SI 2025/1244 from 2025-12-16
- authority 2 · locator
- Regulation 6A, NI extent, additional requirements and category conditions
- authority 2 · url
- https://www.legislation.gov.uk/uksi/2017/1206/regulation/6A
- authority 2 · language
- English
- authority 2 · claim
- The NI additional-requirement record needs its own extent and amendment history.
- authority 2 · limit
- Do not apply the GB extent’s enabling text as if it were the NI provision. Full product-category assessment remains open.
- authority 2 · trigger
- Category/data facts, NI amendment or activity date
- authority 2 · publication
- Original SI plus extent-specific amendments
- authority 2 · application
- NI amendment shown from 2025-12-16
- authority 2 · transition
- Review exact transaction and relevant changes
- authority 2 · entry Into Force
- NI amendment shown from 2025-12-16; other amendments require their own commencement check.
- authority 3 · id
- RED
- authority 3 · issuer
- European Parliament and Council / EUR-Lex
- authority 3 · title
- Radio Equipment Directive 2014/53/EU
- authority 3 · role
- EU directive; consolidated reading text
- authority 3 · version
- Consolidation 2026-05-30; original act 2014-04-16
- authority 3 · locator
- Articles 1–3, 7, 10–14, 16–21; Annexes II–VII
- authority 3 · url
- https://eur-lex.europa.eu/eli/dir/2014/53/2026-05-30/eng
- authority 3 · language
- English
- authority 3 · claim
- Requirement families, manufacturer/operator duties, scoped presumption, assessment routes and documentation.
- authority 3 · limit
- Consolidation aids reading; authentic acts and national implementation govern. Product-specific scope, emergencies and other law are not decided here.
- authority 3 · trigger
- Amendment, product/configuration, territory, activity or route change
- authority 3 · publication
- Original OJ 2014-05-22
- authority 3 · application
- National measures generally apply from 2016-06-13; later provisions have separate dates
- authority 3 · transition
- Check the relevant amendment and product category
- authority 3 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 4 · id
- EU-HS
- authority 4 · issuer
- European Commission / EUR-Lex
- authority 4 · title
- Implementing Decision (EU) 2022/2191
- authority 4 · role
- Official harmonised-standard references; consolidated reading text
- authority 4 · version
- Consolidation 2025-12-11, through 2025/2499; read with EU-NEW
- authority 4 · locator
- Article 1; Annex I row 16 (EN 300 328 V2.2.2), row 23 and rows 164–166 with notices
- authority 4 · url
- https://eur-lex.europa.eu/eli/dec_impl/2022/2191/2025-12-11/eng
- authority 4 · language
- English
- authority 4 · claim
- An exact cited edition and any limitation are distinct from the standards PDF.
- authority 4 · limit
- This consolidation alone omits 2026/2003. EN 18031 full technical text was not read; no clause-level assessment inferred.
- authority 4 · trigger
- New citation, correction, withdrawal or scope change
- authority 4 · publication
- Original 2022-11-10; consolidation date is not first citation date
- authority 4 · application
- Read each entry and amendment
- authority 4 · transition
- Entry-specific; no universal standards expiry
- authority 4 · entry Into Force
- Not separately established in this record; inspect the act and amendment commencement before use.
- authority 5 · id
- EU-NEW
- authority 5 · issuer
- European Commission / EUR-Lex
- authority 5 · title
- Implementing Decision (EU) 2026/2003
- authority 5 · role
- Authentic OJ amending and correcting act
- authority 5 · version
- Adopted 2026-09-04; in force at access
- authority 5 · locator
- Articles 1–3 and complete Annex points (1)–(3), rows 4b, 95a, 103a, 130a, 147a, 184–191
- authority 5 · url
- https://eur-lex.europa.eu/eli/dec_impl/2026/2003/oj
- authority 5 · language
- English
- authority 5 · claim
- Adds/revises named references and restrictions; corrects the earlier deletion reference. It does not amend row 16.
- authority 5 · limit
- A changed list does not mean every product needs a new test. Each changed scope needs review.
- authority 5 · trigger
- New OJ amendment or a product using an affected standard
- authority 5 · publication
- 2026-09-07
- authority 5 · application
- Entry into force on publication
- authority 5 · transition
- Annex point (1) withdrawals apply 2028-03-07
- authority 5 · entry Into Force
- 2026-09-07, publication; Article 3. Delayed withdrawals are separate.
- standard Method
- Use relevant EU harmonised references for the NI case, not the GB designated-standard notice. Review the NI legal extent and product scope.
- technical Value Definition
- Documentary review only: no legal RF limit, detector, measurement bandwidth, distance, statistic or measured result assigned. Inherited 2.450 GHz QPSK values identify the waveform at D3, not a permitted radio technology.
- uncertainty Decision Rule
- No measurement decision. M08-01-RAW-A / DERIVED-A remain scoped teaching evidence with their original planes and uncertainty; no conversion into conformity evidence.
- actor
- Proposed own-name manufacturer; actual legal entity, establishment, importer/distributor chain and transaction unresolved
- responsibility
- Manufacturer retains product/assessment/documentation responsibility; territory-specific actors must be assigned. Lab or body work does not itself assign the market role.
- body Question
- Establish whether third-party assessment is mandatory and whether the proposed body is EU or UK notified for this task. A test laboratory alone does not answer that question.
- evidence 1 · id
- ER-D
- evidence 1 · role
- Inherited fictional report reference from 09.2; no new territorial or requirement coverage inferred
- evidence 1 · version
- v1
- evidence 1 · scope
- Parent U5 GB EMC scope; NI applicability and reuse unreviewed
- evidence Maturity
- Inherited illustrative formal metadata, not an actual report; no new test or body evidence
- scope Match
- unknown
- source Review
- Official text at cited locators read 2026-09-09; technical and product-specific gaps retained
- legal Validity
- not evaluated
- document Marking Question
- NI source required: CE, or CE+UKNI where mandatory assessment uses a UK notified body. Qualifying-NI access to GB requires separate facts; no EEA access inferred from CE+UKNI.
- spectrum Question
- NI territory and actual operating conditions need their own review; no transfer from a GB documents source.
- unresolved 1
- NI territory and actual operating conditions need their own review; no transfer from a GB documents source.
- unresolved 2
- Exact product category, radio mode, bands/channel, bandwidth, power/statistic and access/duty behavior
- unresolved 3
- Real actor, transaction, installation, separation, foreseeable use and activity date
- unresolved 4
- Remote-update design, data/value flows, optional cellular and reachable concurrent states
- unresolved 5
- Evidence sufficiency, language, current citations/restrictions, assessment route and body involvement
- next Action
- NI compliance specialist: replace the copied GB-only marking source; confirm actor/body and goods-status facts, then review F-GB-derived firmware suitability.
- next Owner
- NI compliance specialist
- change Dependencies 1
- territory/activity/date
- change Dependencies 2
- SKU/hardware/sample
- change Dependencies 3
- firmware/region/recovery/update
- change Dependencies 4
- radio mode/concurrency
- change Dependencies 5
- antenna/cable/enclosure
- change Dependencies 6
- supply/accessories
- change Dependencies 7
- installation/user/data/category
- change Dependencies 8
- source revision/citation/restriction
- change Dependencies 9
- actor/body/document/mark
- dates · actual Access
- 2026-09-09
- dates · actual Review
- 2026-09-09
- dates · editorial Recheck
- Before use and on any dependency change; target 2026-12-07 is editorial only
- dates · activity
- Unknown / not established
- dates · synthetic Report Review
- Inherited fixture 2026-09-08; not an actual attestation
- dates · publication
- Recorded separately on each complete authority card
- dates · entry Into Force
- Recorded separately on each authority card; unverified commencement remains open
- dates · application
- Read the provision for the actual product, territory and activity date
- dates · transition
- Keep entry-specific and activity-specific transition conditions; no date inferred from source review
- inherited Records 1
- teaching-node-v1
- inherited Records 2
- NEED-08
- inherited Records 3
- C-MARKET
- inherited Records 4
- M08-01-RAW-A
- inherited Records 5
- M08-01-DERIVED-A
- inherited Records 6
- P09-M01-C09-v1
- inherited Records 7
- P09-M01-C10-v1
Deliver four scoped questions with owners and evidence dependencies. Preserve the parent IDs and source history. Reopen the affected rows when a product, territory, activity date, actor/body, citation or national interface changes.
Check your understanding
Answer each question in your own words, then reveal the model answer.
01Why can a newer standards PDF leave the packet at inspect?
Model answerPublication establishes that an edition exists. It does not establish the exact territorial citation, covered requirement, application window, restrictions or product scope. In the original exercise EU-DE-S has TEACH-STD-A 2.0 but an unknown citation entry. Obtain and read that entry; do not numerically rank version strings. The real trace separately checks ETSI V2.2.2 and EU/GB official entries.
02Does a spectrum standard settle safety, exposure and EMC?
Model answerNo. RED Article 16 limits presumption to covered requirements or parts; the EN 300 328 Annex A trace concerns Article 3(2). Open separately scoped safety/exposure and EMC questions for the actual configuration. Article 17’s route treatment also differs between requirement families; a single universal body rule loses that distinction.
03What changes on 1 November and 8 December in the fictional timeline?
Model answerTEACH edition 1.0 stops providing the declared support at 2026-11-01, an exclusive end. Edition 2.0 still has an open support window, subject to its scope and restriction. A source review due 2026-12-07 becomes overdue on 2026-12-08. That editorial event does not expire the law or automatically invalidate an earlier report.
04Connectivity is known, but product category and data behavior are unknown. What follows?
Model answerResolve each legal predicate against the actual product facts. EU 2022/30 Articles 1–2 distinguish network, privacy and value-transfer conditions and exceptions; the Swiss and NI records have separate sources. In the fictional P AND Q example, yes AND unknown stays unknown. A supported false condition excludes only the reviewed conditional row, leaving other requirements intact.
05What is still missing after copying a report into the Swiss dossier?
Model answerThe report’s actual method, specimen and configuration must be checked against the Swiss question. Then read the Swiss designation and applicable interface. RIR1010-01’s scope, antenna/access and use conditions cannot be selected from carrier frequency alone. The spectrum specialist must establish the real mode and national conditions; a CE label does not answer that question.
06Why does repairing the GB actor leave NI at challenge?
Model answerNI-D still depends on a source explicitly scoped to GB. Replace it with the appropriate NI source and separately establish the actual actor, mandatory assessment route, body scope/location and marking consequence. NI guidance distinguishes CE from CE+UKNI when mandatory assessment uses a UK notified body. Qualifying-NI access to GB needs its own facts. The exercise appoints no actor or body.
References and further study
Actually researched official sources, accessed and reviewed at the stated locators on 2026-09-09. Verify before use. Publication, legal application/transition and editorial review are distinct dates. These cards supply orientation and source-reading evidence; they are not the fictional comparator inputs.
- RED · Radio Equipment Directive 2014/53/EU
European Parliament and Council / EUR-Lex · EU directive; consolidated reading text. Consolidation 2026-05-30; original act 2014-04-16. Language: English.
Read: Articles 1–3, 7, 10–14, 16–21; Annexes II–VII. Requirement families, manufacturer/operator duties, scoped presumption, assessment routes and documentation.
Dates: publication Original OJ 2014-05-22; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application National measures generally apply from 2016-06-13; later provisions have separate dates; transition Check the relevant amendment and product category. Access/review 2026-09-09.
Limit: Consolidation aids reading; authentic acts and national implementation govern. Product-specific scope, emergencies and other law are not decided here. Recheck: Amendment, product/configuration, territory, activity or route change.
- DE · Funkanlagengesetz (FuAG), § 4
German federal legislation portal · German national legislation. Current online § 4 at access. Language: German; original English paraphrase here.
Read: § 4(1)–(4), essential requirements. Germany is the declared EU market; its national requirement text must accompany the RED source chain.
Dates: publication Version date not shown in the paragraph view; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Activity-specific review required; transition Not established for the illustrative product. Access/review 2026-09-09.
Limit: This paragraph is not a complete German market-access or operating-law review. Recheck: National amendment or different EU destination.
- EEA · EEA-Lex: Directive 2014/53/EU
EFTA Secretariat · Official incorporation/status record. JCD 089/2016; incorporation shown in force at access. Language: English.
Read: Incorporation and entry-into-force fields. EEA relevance and incorporation must be checked separately from an EU act’s publication.
Dates: publication Act and JCD have separate dates; entry into force Incorporation shown in force at access; no single date is assigned to all EEA amendments.; application Check the specific incorporation record; transition No blanket EU/EEA date equivalence. Access/review 2026-09-09.
Limit: Does not establish every amendment’s incorporation, adaptation or national use condition in each EEA state. Recheck: New EEA destination, amendment or Joint Committee decision.
- EU-LIST · Harmonised standards: radio equipment
European Commission · Official discovery and amendment index. Live index checked 2026-09-09. Language: English.
Read: Implementing decisions; amendment of 4 September 2026. The current index links a newer amendment than the linked consolidated citation text.
Dates: publication Individual linked acts govern; entry into force Not a legislative commencement; see the separate governing instrument.; application Not a legal application date; transition Read the act. Access/review 2026-09-09.
Limit: An index or summary is not the authentic citation instrument. Recheck: Every publication or standards-review decision.
- EU-HS · Implementing Decision (EU) 2022/2191
European Commission / EUR-Lex · Official harmonised-standard references; consolidated reading text. Consolidation 2025-12-11, through 2025/2499; read with EU-NEW. Language: English.
Read: Article 1; Annex I row 16 (EN 300 328 V2.2.2), row 23 and rows 164–166 with notices. An exact cited edition and any limitation are distinct from the standards PDF.
Dates: publication Original 2022-11-10; consolidation date is not first citation date; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Read each entry and amendment; transition Entry-specific; no universal standards expiry. Access/review 2026-09-09.
Limit: This consolidation alone omits 2026/2003. EN 18031 full technical text was not read; no clause-level assessment inferred. Recheck: New citation, correction, withdrawal or scope change.
- EU-NEW · Implementing Decision (EU) 2026/2003
European Commission / EUR-Lex · Authentic OJ amending and correcting act. Adopted 2026-09-04; in force at access. Language: English.
Read: Articles 1–3 and complete Annex points (1)–(3), rows 4b, 95a, 103a, 130a, 147a, 184–191. Adds/revises named references and restrictions; corrects the earlier deletion reference. It does not amend row 16.
Dates: publication 2026-09-07; entry into force 2026-09-07, publication; Article 3. Delayed withdrawals are separate.; application Entry into force on publication; transition Annex point (1) withdrawals apply 2028-03-07. Access/review 2026-09-09.
Limit: A changed list does not mean every product needs a new test. Each changed scope needs review. Recheck: New OJ amendment or a product using an affected standard.
- ETSI · EN 300 328 V2.2.2 (2019-07)
ETSI · Technical standard text; not the citation instrument. V2.2.2; adopted 2019-07-01. Language: English.
Read: Cover, clause 1 (printed p. 10), Annex A and Table A.1 (printed p. 75). Scope concerns 2.4 GHz wideband data transmission equipment; Annex A maps requirements to RED Article 3(2).
Dates: publication 2019-07; entry into force Not a legislative commencement; see the separate governing instrument.; application Standard publication is not citation support; transition See separate territory citation. Access/review 2026-09-09.
Limit: Candidate for an appropriately specified radio, not automatic coverage of the generic QPSK node or other requirement families. No product test performed. Recheck: Exact radio mode, edition, method, configuration or citation change.
- EU-ADD · Delegated Regulation (EU) 2022/30, as amended
European Commission / EUR-Lex · Delegated legislation activating selected RED requirements. Consolidation 2023-10-27 incorporating 2023/2444. Language: English.
Read: Articles 1–3: categories, exceptions and application. Internet communication, data handling, listed categories and value-transfer functions answer different applicability questions.
Dates: publication Original 2022-01-12; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application 2025-08-01 after amendment; transition Repeal from 2027-12-11 under 2026/339. Access/review 2026-09-09.
Limit: Connectivity alone does not answer every privacy/fraud row; review exceptions. Read alongside the enacted future repeal EU-REPEAL. Recheck: Category, data flow, connectivity, update or date change.
- EU-REPEAL · Delegated Regulation (EU) 2026/339
European Commission / EUR-Lex · Enacted repeal with future application. Adopted 2026-02-16; published 2026-04-29. Language: English.
Read: Recital 5; Articles 1–2. Repeals 2022/30 with effect from 2027-12-11; earlier placing dates retain their own surveillance context.
Dates: publication 2026-04-29; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Repeal effective 2027-12-11; transition Keep the earlier placing-on-market period distinct. Access/review 2026-09-09.
Limit: The repeal is enacted, not merely a proposal; its future effect does not erase present obligations or automatically amend Swiss law. Recheck: Activity date and subsequent amendment.
- CRA · Cyber Resilience Act, Regulation (EU) 2024/2847
European Parliament and Council / EUR-Lex · Separate EU legislation. Original OJ act of 2024-10-23. Language: English.
Read: Articles 2, 69 and 71; Article 14 reporting referral. The security review has a separate legislative timeline; Article 71 differentiates main application, reporting and body provisions.
Dates: publication 2024-11-20; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Main 2027-12-11; Article 14 2026-09-11; Chapter IV 2026-06-11; transition Article 69 requires a separate transition review. Access/review 2026-09-09.
Limit: No CRA classification or security sufficiency determined. Product and transition scope require specialist review. Recheck: Product/security support model, placing date or amendment.
- CH-MARKET · Market access of radiocommunications equipment
Swiss OFCOM · Official Swiss guidance. Live guidance at access. Language: English.
Read: Conditions, assessment, documentation and linked national requirements. The Swiss record needs its own market-access and frequency-use sources.
Dates: publication No single consolidated date; entry into force Not a legislative commencement; see the separate governing instrument.; application See TIO and OFCOM ordinance; transition See the applicable provision. Access/review 2026-09-09.
Limit: OFCOM’s telecom guidance does not cover every applicable law. Recheck: Swiss product, actor, source or activity change.
- CH-TIO · Telecommunications Installations Ordinance (OIT/TIO), SR 784.101.2
Swiss Federal Council / Fedlex · Swiss legislation. Ordinance 2015-11-25; current text state 2024-08-15. Language: French legal text; original English paraphrase here.
Read: Articles 1–2, 7, 12–19; assessment, technical file, declaration, retention, marking and information. Swiss requirements and procedures, documentation and marking have a Swiss legal source even where their structure is similar to RED.
Dates: publication Original RO 2016 179; entry into force Original ordinance 2016-06-13; later amendments have separate commencement dates.; application Original entry 2016-06-13; current-state amendments separately dated; transition Future version listed for 2028-07-01 is not the current text. Access/review 2026-09-09.
Limit: Read current French text; English access did not yield the same readable text. Actual actor and future amendments need scope review. Recheck: TIO version, hardware/software, actor or intended-use change.
- CH-OOIT · OFCOM ordinance (OOIT), SR 784.101.21
Swiss OFCOM / Fedlex · Swiss implementing legislation. Ordinance 2016-05-26; current state 2026-01-01. Language: French legal text; original English paraphrase here.
Read: Articles 1, 2, 2a, 10b; Annex 1 rows 7–9. Additional requirements and the Swiss transition are recorded in Swiss legislation; interfaces have their own legal references.
Dates: publication Original RO 2016 1673; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Article 10b allowed affected nonconforming equipment to be placed through 2025-07-31; transition Read each affected category and any subsequent Swiss measure. Access/review 2026-09-09.
Limit: Do not apply the EU repeal date to this text by analogy. Recheck: OFCOM amendment, category/data facts or activity change.
- CH-STANDARDS · Designation of technical standards, FF 2025 3694
Swiss OFCOM / Fedlex · Swiss official designation notice. Decision and publication 2025-12-30; current notice linked by OFCOM at access. Language: French; original English paraphrase here.
Read: Sections 1.2, 2.1, 4.2 and 5. Designates the referenced EU publications through 2025/2499 and maps essential requirements; its informative consolidated list has no legal effect.
Dates: publication 2025-12-30; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Designation in the notice; transition Read the referenced entries and replacement notice. Access/review 2026-09-09.
Limit: This notice does not itself establish Swiss adoption of the later EU 2026/2003 amendment. Recheck before using a changed entry. Recheck: New OFCOM designation or EU citation amendment.
- CH-RIR · RIR1010-01: wideband data transmission systems
Swiss OFCOM · National radio interface regulation. Edition 6.0 / 01.08.2018 displayed at access. Language: English.
Read: Rows 1–11 normative, especially 2 and 7–9; rows 12–15 informative. Application, antenna, access conditions and licensing/use scope must match the actual radio; the interface covers Switzerland and Liechtenstein.
Dates: publication Edition date 2018-08-01; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Read current interface and intended use; transition No product-specific permission established. Access/review 2026-09-09.
Limit: A 2.450 GHz carrier alone does not select this interface. Unversioned standard mentions do not prove edition-specific designation. Recheck: Radio mode, antenna, access controls, installation or RIR revision.
- CH-DOC · Declaration of conformity (EU)
Swiss OFCOM · Official Swiss documentation guidance. Published 2023-12-11. Language: English.
Read: Full/simplified declaration, language and accessory/software scope. The Swiss dossier must cover the intended configuration and the applicable declaration/language conditions.
Dates: publication 2023-12-11; entry into force Not a legislative commencement; see the separate governing instrument.; application Guidance; read the TIO; transition Not a statutory expiry. Access/review 2026-09-09.
Limit: No declaration, signature or approval is generated by this lesson. Recheck: Product, software, accessories or language/market change.
- GB-LAW · Radio Equipment Regulations 2017, SI 2017/1206
UK legislation portal · UK legislation with territorial extent. Latest revised text accessed 2026-09-09; outstanding-change notices retained. Language: English.
Read: Regulations 36A and 41; separate GB/NI extents. GB recognition is conditional: Regulation 36A includes documentation and exact corresponding-standard provisions; Regulation 41 distinguishes requirement families.
Dates: publication Original SI 2017/1206; revised text has separate amendment dates; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Read current extent and conditions; transition No generic 2024 CE cutoff inferred. Access/review 2026-09-09.
Limit: Future/outstanding changes and the exact activity need review; a CE logo alone does not demonstrate these conditions. Recheck: Legislative amendment, conformity basis, actor or activity date.
- GB-AMEND · Product Safety and Metrology etc. (Amendment) Regulations 2024, SI 2024/696
UK legislation portal · Enacted amending legislation. 2024 instrument. Language: English.
Read: Commencement and regulation 20 (radio equipment amendments). The continuing GB recognition has an enacted measure behind the policy/guidance.
Dates: publication 2024 instrument; entry into force 2024-10-01; commencement of the 2024 amending instrument.; application 2024-10-01; transition Radio-equipment amendments remove the relevant time limit. Access/review 2026-09-09.
Limit: Read the resulting radio-equipment provisions; the instrument is not proof that this product satisfies them. Recheck: Subsequent amendment or product scope change.
- GB-GUIDE · Radio Equipment Regulations 2017: Great Britain
UK Office for Product Safety and Standards · Official GB guidance. March 2025 guidance; collection updated 2025-12-16. Language: English.
Read: Manufacturer/importer duties, conformity and marking sections including section 9. GB permits the applicable CE-recognition route alongside UKCA; role, conformity evidence and documents still matter.
Dates: publication Guidance headed March 2025; entry into force Not a legislative commencement; see the separate governing instrument.; application Radio-equipment CE recognition continues beyond 2024; transition Conditions remain; “indefinite” does not freeze legislation. Access/review 2026-09-09.
Limit: Guidance explains the law; product-specific recognition and body conditions need review. Recheck: Marking choice, actor, body, law or designated-standard change.
- GB-INDEX · Designated standards: radio equipment
UK government · Official notice index. Page updated 2026-05-01; notice listed 2026-01-21. Language: English.
Read: Notice 0130/26 and consolidated-list links. Page update, designation notice and standards-edition dates are different records.
Dates: publication Page update 2026-05-01; entry into force Not a legislative commencement; see the separate governing instrument.; application See the notice; transition See entry-specific dates. Access/review 2026-09-09.
Limit: The index’s update date is not the notice’s legal date. Recheck: New designation, correction or withdrawal.
- GB-NOTICE · Designated standards notice 0130/26
UK government · GB official designation notice. 21 January 2026; 28-page PDF. Language: English.
Read: Territorial header; Annex I part 1 row 16, printed p. 4. EN 300 328 V2.2.2 is a separate GB entry; the same edition also appears in the EU reference used here.
Dates: publication 2026-01-21; entry into force Not separately established in this record; inspect the act and amendment commencement before use.; application Notice 0130/26, England/Wales/Scotland; transition Entry-specific; no blanket standards expiry. Access/review 2026-09-09.
Limit: This is not NI’s citation source or a declaration about the sample. Read other rows for their restrictions/withdrawals. Recheck: New GB notice or changed product/edition.
- NI-GUIDE · Radio Equipment Regulations 2017: Northern Ireland
UK Office for Product Safety and Standards · Official NI guidance. Collection updated 2025-12-16; live NI text at access. Language: English.
Read: Economic operators; conformity assessment/marking; sections 14–16. NI needs CE; mandatory assessment by a UK notified body adds UKNI. CE+UKNI does not provide EEA access; qualifying-NI access to GB is separate.
Dates: publication Live guidance; collection update is not commencement; entry into force Not a legislative commencement; see the separate governing instrument.; application Check NI law for the activity date; transition Do not copy GB marking logic. Access/review 2026-09-09.
Limit: Actual body role, territory scope and qualifying-goods status are unresolved for this case. Recheck: Actor/body location, assessment route, NI status or law change.
- NI-LAW · Radio Equipment Regulations 2017, regulation 6A
UK legislation portal · Territorially differentiated legislation. Revised NI provisions include SI 2025/1244 from 2025-12-16. Language: English.
Read: Regulation 6A, NI extent, additional requirements and category conditions. The NI additional-requirement record needs its own extent and amendment history.
Dates: publication Original SI plus extent-specific amendments; entry into force NI amendment shown from 2025-12-16; other amendments require their own commencement check.; application NI amendment shown from 2025-12-16; transition Review exact transaction and relevant changes. Access/review 2026-09-09.
Limit: Do not apply the GB extent’s enabling text as if it were the NI provision. Full product-category assessment remains open. Recheck: Category/data facts, NI amendment or activity date.
Continue the evidence chain with 07.7’s coexistence and technology selection and 08.6’s scoped pre-compliance evidence. This module does not choose actual bodies, file documents or make case-specific legal/security decisions.